Change History

2017-04-04
      • Enhancement: New Dashboard graphics (Ref.:DEV_ACE-568)
      • Enhancement: New tutorial that is displayed on Dashboard page upon first entry  (Ref.:DEV_ACE-568)
      • Bug fix: Scrollbar disappearing IE11 Edit task page (Ref.:Bug_ACE-2058)
      • Bug fix: JS errors upon loading certain pages (Ref.:Bug_ACE-multiple)
2017-02-14
      • Enhancement: New personal menu for quick access to your items (Ref.:DEV_ACEB-564)
      • Enhancement: New vertical menus near the top  (Ref.:DEV_ACEB-563)
2016-11-29
      • Bug fix: Export error when selecting “onscreen columns only” (Ref.:Bug_ACE-2031)
      • Bug fix: Timeclock time not displaying time in correct timezone  (Ref.:Bug_ACE-2026)
      • Bug fix: Actual end date deleting when changing information through the bulk task update dialogue  (Ref.:Bug_ACE-2034)
      • Bug fix: Tooltip on timesheet comments not displaying properly and does not use CSS style (Ref.:Bug_ACE-2035)
      • Bug fix: Delete project not possible due to missing UserID (Ref.:Bug_ACE-2033)
      • Bug fix: Timeclocks stopping on their own in certain cases (Ref.:Bug_ACE-2029)
      • Bug fix: Doubling in recurrent task creation (Ref.:Bug_ACE-2030)
2016-11-01
      • Enhancement: Connection with Bridge24 Kanban board, Power Grid, export and calendar (Ref: DEV_ACEB-007)
      • Enhancement: Access Bridge24 directly from AceProject notification email (Ref: DEV_ACEB-009)
2016-10-03
      • Bug fix: User removed when updating from CSV file and header Assignments/Reviewers missing  (Ref.:Bug_ACE-2010)
      • Bug fix: Custom Task report timeout error  (Ref.:Bug_ACE-1988)
      • Bug fix: Forgot password not functioning/email not being sent for some users  (Ref.:Bug_ACE-1994)
2016-09-06
      • Bug fix: Create task by email not functioning for certain projects (Ref.:Bug_ACE-1990)
      • Bug fix: Adding email with domain of .email not working (Ref.:Bug_ACE-1978)
      • Bug fix: Add client drop-down does not refresh until page refresh (Ref.:Bug_ACE-1971)
      • Bug fix: Last update of a task not updated when document deleted (Ref.:Bug_ACE-1973)
2016-06-22
      • Enhancement: New in-app self-service billing page  (Ref.:DEV_ACE-509)
      • Enhancement: Support for PayPal payment  (Ref.:DEV_ACE-509)
      • Enhancement: In-app access to billing transactions  (Ref.:DEV_ACE-509)
2016-02-26
      • Enhancement: AceProject mobile Android 4.1+ release (Ref.:DEV_ACE-453)
      • Improvement: Upload photo to task from Android camera (Ref.:BUG_ACE-1420)
2016-01-26
      • Enhancement: iOS9.x release (see upcoming blog post) (Ref.:DEV_ACE-453)
      • Improvement:  Retrieving task comments increase in performance  (Ref.:ACE_PERF-111)
      • Bug fix: Using single quote in Custom Product Name results in crashes (Ref.:BUG_ACE-1955)
      • Bug fix: Commenting by non-PM on a completed task not sending out email notification (Ref.:BUG_ACE-1826)
      • Bug fix: Adding document just off the Browse window opens it (not adds it) to the browser (Ref.:BUG_ACE-1967)
      • Bug fix: Quick Adding tasks sometimes blocks when 2 users are assigned at the same time (Ref.:BUG_ACE-1962)
      • Bug fix: Quick add users able to assign on completed projects should not be allowed (Ref.:BUG_ACE-1965)
      • Bug fix: After selecting a user in the filters, not able to select the empty line to reset (Ref.:BUG_ACE-1970)
      • Bug fix: Add client drop down does not display right away, must refresh Edit Project page (Ref.:BUG_ACE-1971)
      • Bug fix: Last update on the task not updated when a task document is deleted (Ref.:BUG_ACE-1973)
      • Bug fix: Quick add users able to assign on completed projects should not be allowed (Ref.:BUG_ACE-1965)
2015-11-26
      • Enhancement: Improvement for the visibility/readability of the Task history information from the Edit Task page (Ref.:DEV_ACE-511)
      • Enhancement: Open a task in a new browser tab using Ctrl+click on the summary or icon from Edit Task page (Ref.:UX_ACE-128)
      • Enhancement: Display the context of the page in the title of the browser tab (Ref.:UX_ACE-129)
      • Enhancement: All sorting/ordering on Assigned and Reviewer columns (Ref.:DEV_ACE-521)
      • Enhancement: Copy Project description when creating a project from a template (Ref.:DEV_ACE-1058)
      • Improvement:  A searchable dropdown was added to the time approver in the My Time filter panel (Ref.:DEV_ACE-482)
      • Bug fix: Template of a template project not creating “linked” child projects (Ref.:BUG_ACE-1945)
      • Bug fix: Administrators that have never been assigned to a project do not show up on Active user lists (Ref.:BUG_ACE-1950)
      • Bug fix: Move-Copy update task related items such as the timeclock (Ref.:BUG_ACE-1928)
2015-10-14
      • Enhancement: A scroll was added for the fields Assigned and Reviewers to aide in display of fields with a large number of items (Ref.:DEV_ACE-498)
      • Enhancement: On the right panel filter zone, filters with many items now have a searchable area to find items quicker (Ref.:DEV_ACE-500)
      • Enhancement: Left menu now supports Show/Hide allowing for greater screen usage (Ref.:DEV_ACE-507)
      • Improvement: The Multiple Task Assignments function is now more visible on the Project/Edit Project pages (Ref.:DEV_ACE-492)
      • Improvement: All pop-ups now have a default button for an action to take place using the Enter key (Ref.:DEV_ACE-507)
      • Improvement: A toggle system for module enable/disable in the Administration>Overview area is in place (Ref.:DEV_ACE-517)
      • Improvement: Project tab no longer opened when clicking on a task link within an email notification (Ref.:DEV_ACE-1018
      • Improvement: Gantt view mode selection now more logical using 3 icons (Ref.:GAN_ACE-133)
      • Improvement: Importing tasks now has optional “do not notify” setting (Ref.:DEV_ACE-1702)
      • Improvement: The pop-up Add Project dialogue has the buttons inversed for the creation and opening a project (Ref.:DEV_ACE-524)
      • Bug fix: Printing of an expense item must also include the list of attachments (Ref.:BUG_ACE-1746)
      • Bug fix: Close All menu item relocated on the Project drop down menu (Ref.:Bug_ACE-1866)
      • Bug fix: Custom Task Report error if an ordering is made in results before executing again (Ref.:Bug_ACE-1920)
      • Bug fix: An Administrator user does not have access to Time>Time Approval if not assigned to any project (Ref.:BUG_ACE-1898)
      • Bug fix: When an auto-assigned user on a project and a modification to the assigned column is made in the Gantt, the assignees reinitialize to the default auto-assigned values (Ref.:BUG_ACE-1899)
      • Bug fix: Icon missing for first item in task document list (Ref.:BUG_ACE-1912)
      • Bug fix: Right action panel does not open by default on Administration>Account (Ref.:BUG_ACE-1914)
      • Bug fix: For Chrome on the Mac OS the documents in the task list do not correctly display the quantity (Ref.:BUG_ACE-1918)
      • Bug fix: In the Gantt filter panel, the search is not launched after pressing the Enter key (Ref.:BUG_ACE-1907)
      • Bug fix: Project Gantt – clicking on column “Actual start date” brings back error (Ref.:BUG_ACE-1929)
2015-06-25
      • Enhancement: Custom Time Report with ability to save/name reports and make public (Ref.:DEV_ACE-195)
      • Enhancement: Edition of all fields that are editable directly in the Gantt grid (Ref.:GAN_ACE-123)
      • Enhancement: New menu system for navigation under the tabs for Home and Projects (Ref.:UX-85)
      • Enhancement: Mandatory/non-mandatory dependency setting now on the Dependency pop-up dialogue (Ref.:GAN_ACE-110)
      • Enhancement: 3 display views available for the Gantt chart (Ref.:GAN_ACE-121)
      • Enhancement: All functionality in Task Gantt has been ported to the Project Gantt area (Ref.:GAN_ACE-102)
      • Enhancement: Copy this user function added on the right panel of Edit User page (Ref.:DEV_ACE-422)
      • Enhancement: Marked Custom Time Reports will be displayed on dashboard in the Custom Reports area (Ref.:DEV_CTR-1)
      • Enhancement: New filter “Marked task” in the custom task report (Ref.:DEV_ACE-1019)
      • Improvement: Make available the approval of time directly on the Time Item dialogue box (Ref.:DEV_ACE-193)
      • Improvement: Add the order to the columns in the client list (Ref.:DEV_ACE-483)
      • Improvement: Add the order to the columns in the user list (Ref.:DEV_ACE-484)
      • Improvement: Allow non-PMs or Administrators the ability to make batch updates on tasks (restricted to their user rights) (Ref.:DEV_ACE-488)
      • Improvement: When entering the timesheet the 0.00 will automatically be selected (Ref.:BUG_ACE-1807)
      • Improvement: Make the Create via email link more accessible (Ref.:DEV_ACE-1197)
      • Improvement: Added notification possibility when importing tasks (Ref.:DEV_ACE-1702)
      • Bug fix: Filename creating error upon file download in FireFox because of a single quote in filename (Ref.:BUG_ACE-1770)
      • Bug fix: Current User in Custom Task Report not functional (Ref.:BUG_ACE-1812)
2015-04-13
      • Enhancement: Develop a batch Add Task mechanism by grid and text entry. (Ref.:DEV_ACE-462)
      • Enhancement: Include a new Quick Add menu area and features. (Ref.:DEV_ACE-463)
      • Enhancement: Permit the edition of a task directly in the grid of the task Gantt chart. (Ref.:GAN_ACE-111)
      • Enhancement: Added the concept of “Me” variable (current user) for use within filters and the custom task report. (Ref.:DEV_ACE-456)
      • Enhancement: Support secure/strong password. (Ref.:DEV_ACE-1172)
      • Improvement: Expense modification now conserves user. (Ref.:DEV_ACE-1667)
      • Improvement: Restructuring of buttons on the top right zone. (Ref.:UX-111)
      • Improvement: Tooltip of the task in the Gantt chart modified by adding the task number before the summary. (Ref.:GAN_ACE-88)
      • Improvement: The task Gantt chart now works correctly in 5 day and 7 day mode. (Ref.:GAN_ACE-105)
      • Improvement: Include the Add Expense link on the right panel of the Edit task page. (Ref.:DEV_ACE-457)
      • Improvement: The Timeclock pop-up window has been re-organized with a new tab. (Ref.:DEV_ACE-429)
      • Improvement: Increase the number of characters of the summary field from 75 to 100. (Ref.:DEV_ACE-452)
      • Improvement: Move/copy a completed task. (Ref.:DEV_ACE-999)
      • Improvement: Delete link added to documents on the document search page. (Ref.:DEV_ACE-1137)
      • Bug fix: Calendar is not able to print in color. (Ref.:BUG_ACE-1623)
      • Bug fix: “Can be started” graph not displaying correct number of tasks as the corresponding list. (Ref.:BUG_ACE-1756)
      • Bug fix: Not able to add an expense when in a project and assigned tasks do not show up in the drop-down list. (Ref.:BUG_ACE-1761)
      • Bug fix: Timeout/error when going to Home>Time>My Time under certain circumstances. (Ref.:BUG_ACE-1766)
      • Bug fix: Filename creating error upon file download in FireFox because of a single quote in filename. (Ref.:BUG_ACE-1770)
      • Bug fix: Ascending order in the Time report for Time Status not functional. (Ref.:BUG_ACE-1771)
      • Bug fix: Viewing all tasks in Add time when “Can Open Projects” set to “No” under certain circumstances. (Ref.:BUG_ACE-1777)
      • Bug fix: Uploading a document and renaming it is producing an error. (Ref.:BUG_ACE-1781)
2015-02-11
      • Enhancement: Gantt chart replacing the existing one. (Ref.:GAN_ACE-1)
      • Enhancement: In the email notification of a treated timesheet the link to bring the user to the timesheet within AceProject is now provided. (Ref.:DEV_ACE-238)
      • Enhancement: From the Edit Task page a new option is added “+ Add a New Task” to the Save and Update button. (Ref.:UX-97)
      • Enhancement: Support the usage of the Shift + Click for multiselecting from a list of tasks for bulk actions. (Ref.:UX-872)
      • Improvement: Added the option “Gantt Chart” as page by default (Home). (Ref.:GAN_ACE-59)
      • Bug fix: Error when clicking on a task document from the Android app. (Ref.:BUG_ACE-1679)
      • Bug fix: Duplicate email notifications being sent in certain cases. (Ref.:BUG_ACE-1690)
      • Bug fix: End date of project in Project Gantt not displaying correctly on the Daily view. (Ref.:BUG_ACE-1693)
      • Bug fix: Rejected time items do not delete when using global select with delete action. (Ref.:BUG_ACE-1694)
      • Bug fix: Time Report not displaying correct results when projects with PM/non-PM user selected. (Ref.:BUG_ACE-1695)
      • Bug fix: Export without HTML tags contains tags in comment field. (Ref.:BUG_ACE-1701)
      • Bug fix: Disabling Time & Expense Modules does not remove corresponding sections on the dashboard. (Ref.:BUG_ACE-1708)
      • Bug fix: The comments are not exported to the csv file from the Custom Task Report results. (Ref.:BUG_ACE-1716)
      • Bug fix: Scrolling in the Project document page does not work in certain browsers. (Ref.:BUG_ACE-1725)
      • Bug fix: Text “cut” in certain combo boxes within FireFox. (Ref.:BUG_ACE-1732)
2014-10-02
      • Enhancement: Forward an email will now create a task (Ref.:DEV_ACE-454)
      • Enhancement: Documents are now stored on Amazon (Ref.:PRJ_API-101)
      • Bug fix: Task creation is not added to the Task History when a task is copied (Ref.:BUG_ACE-1605)
      • Bug fix: Error when assigning new task number automatically (Ref.:BUG_ACE-1642)
      • Bug fix: A user with “limited” task editing rights is unable to edit an expense that is in progress (Ref.:BUG_ACE-1653)
2014-09-16
      • Enhancement: A document indicator is added/linked to comment if document added at the same time as the comment (Ref.:UX-39)
      • Enhancement: Stars for Marked tasks, Marked Custom task reports and marked Projects support 6 color levels that user can adjust and order (Ref.:DEV_ACE-436)
      • Enhancement: Usergroup modification and creation done through a pop-up dialogue with no page refresh/navigation (Ref.:DEV_TIJ-205)
      • Enhancement: New preview component implemented allowing users to make preview larger and more easily navigate (Ref.:BUG_ACE-1580)
      • Enhancement: New “Standby” status for recurrent tasks allows one to temporarily interrupt the creation of tasks during the recurrency period (Ref.:ESS_ACE-1)
      • Improvement: The dependencies area has been updated with the actions now taking place within the right panel (Ref.:DEV_ACE-179)
      • Improvement: State information now included for all document types in the Home>Document list (Ref.:DEV_ACE-399)
      • Improvement: Importing tasks and users now done exclusively through the API providing more flexibility and error tracking (Ref.:DEV_ACE-431)
      • Improvement: Administration>Tools>Import Data screen improved layout (Ref.:DEV_ACE-432)
      • Improvement: Copy/Move task now takes place in a pop-up dialogue box with no page refreshes required (Ref.:DEV_TIJ-207)
      • Improvement: Edit Expense now within a pop-up dialogue with no page refreshing required (Ref.:DEV_TIJ-441)
      • Bug fix: Task recurrences are not accessible from Static Templates (Ref.:DEV_ACE-438)
      • Bug fix: Select all box for recurrences missing at the project level (Ref.:DEV_ACE-444)
      • Bug fix: Time pop-up now adjusts automatically to the browser dimensions rather than being a fixed dimension (Ref.:DEV_ACE-448)
      • Bug fix: Drop-down missing for selecting the number of items per page on the My Expenses page (Ref.:DEV_ACE-435)
      • Bug fix: Importing .csv file not handling date format correctly (Ref.:BUG_ACE-1191)
      • Bug fix: Offset introduced when going from Month to Year within the Project Gantt chart (Ref.:BUG_ACE-1427)
      • Bug fix: Default pages settings in User profile missing items (Ref.:BUG_ACE-1552)
      • Bug Fix: Copy time item to same week not functioning (Ref.:BUG_ACE-1575)
      • Bug fix: Project Type filter from Home>Document list not functioning (Ref.:BUG_ACE-1585)
      • Bug fix: Hitting Enter on the Add Time pop-up to save does not dismiss the screen (Ref.:BUG_ACE-1597)
      • Bug fix: Copy recurrence from a task template not functioning (Ref.:BUG_ACE-1603)
      • Bug fix: Selecting multiple users through the usergroup header in drop-down not working in the new/edit recurring tasks page (Ref.:BUG_ACE-1615)
      • Bug fix: The filter “in Progress or Submitted” only returns the In progress expense items (Ref.:BUG_ACE-1619)
      • Bug fix: Option “Export on-screen” in export dialogue produces anomalies (Ref.:BUG_ACE-1624)
2014-06-19
      • Enhancement: Timeclock now accessible through a pop-up dialogue box. (Ref.:DEV_TIJ-88)
      • Enhancement: A new Add User Assistant mechanism has been added. (Ref.:DEV_TIJ-197)
      • Enhancement: Ability to advance through preview images like a slideshow. (Ref.:DEV_TIJ-198)
      • Enhancement: Messages from the Message Center now open in a pop-up dialogue box. (Ref.:DEV_ACE-392)
      • Enhancement: Text-to-search functionality added on the filters panel on the Expense Approval page. (Ref.:DEV_ACE-404)
      • Enhancement: The document download URL has been added to the GetDocuments function in the API. (Ref.:DEV_ACE-1094)
      • Enhancement: Ability to add and modify Project Status, Type and Priority directly from the Edit Project page. (Ref.:DEV_TIJ-390)
      • Enhancement: Creating a user will create an auto-generated password if not provided. (Ref.:BUG_ACE-257)
      • Modification: User can no longer delete his own approved expense item (aligned now with Time items philosophy). (Ref.:DEV_ACE-410)
      • Modification: Terminology in Expense Approval and Expense list are now uniform. (Ref.:DEV_ACE-415)
      • Modification: Edit icon added in expense lists. (Ref.:DEV_ACE-420)
      • Modification: User not blocked when previewing an image multiple times as it is no longer counted as a download. (Ref.:DEV_ACE-385)
      • Bug fix: When adding comment via email, the comment doubles within the task. (Ref.:BUG_ACE-1426)
      • Bug fix: Filters not remembered correctly within Time Report in certain situations. (Ref.:BUG_ACE-1498)
      • Bug fix: Auto-generated emails returned as comment and in enters in loop. (Ref.:BUG_ACE-1503)
      • Bug fix: Error produced when SMTP turned off at the account level. (Ref.:BUG_ACE-1529)
      • Bug fix: Second email with false error message sent on a background report created with more than 1000 lines. (Ref.:BUG_ACE-1530)
      • Bug fix: Last date visited field populated in error by the task creation date. (Ref.:BUG_ACE-1531)
      • Bug fix: When selecting all projects using the checkbox in the Administration>Tools>Deleted Projects page an error occurs (Ref.:BUG_ACE-1532)
      • Bug fix: The Show/Hide dialogue box for Task Gantt in IE does not have a contour nor action buttons. (Ref.:BUG_ACE-1535)
      • Bug fix: Password recovery page not displaying correctly. (Ref.:BUG_ACE-1542)
      • Bug fix: When adding time via Timeclock, actual hours was not updated on the task. (Ref.:BUG_ACE-1543)
      • Bug fix: Create project from template and select “copy recurrencies” produces error when no recurrencies exist. (Ref.:BUG_ACE-1544)
      • Bug fix: Label at the account and profile level for data and number format are not uniform. (Ref.:BUG_ACE-1558)
      • Bug fix: User on My Assigned Tasks page is unable to filter by project. (Ref.:BUG_ACE-1560)
      • Bug fix: Duplication of projects in the Project drop-down on the Add Time dialogue box. (Ref.:BUG_ACE-1563)
      • Bug fix: The carriage returns are lost when adding comments in the Quick Comment area. (Ref.:BUG_ACE-1576)
      • Bug fix: Error when trying to add all users to a new project during creation. (Ref.:BUG_MOB-301)
2014-05-07
      • Enhancement: Expense can now be transferred to another project. (Ref.:DEV_ACE-381)
      • Enhancement: Copy recurrent task definitions now possible when creating a project from a template. (Ref.:DEV_ACE-386)
      • Enhancement: Managing clients is now a user right and accessible to non-administrators. (Ref.:DEV_ACE-395)
      • Enhancement: Project documents section includes new dynamic functionality. (Ref.:DEV_ACE-398)
      • Enhancement: Edit client popup available from Edit Project page when user has manage client right. (Ref.:DEV_ACE-402)
      • Enhancement: Non-Project Manager user that has Time approval right now has read only access to time items for the project. (Ref.:DEV_ACE-411)
      • Enhancement: Menu items now consistent whether at the Home or Project level making function accessibility and initial comprehension easier. (Ref.:UX-26)
      • Enhancement: Time item now available through an accessible pop-up without page refresh. (Ref.:UX-77)
      • Enhancement: Videos and help available through a new right panel on the Dashboard. (Ref.:UX-81)
      • Modification: In the My Timesheet list the week contains the hyperlink to open the associated timesheet and not the status. (Ref.:UX-89)
      • Modification: Browser spell check ability activated for comments field, details field, messages, etc. (Ref.:DEV_ACE-374)
      • Bug fix: The User Directory list filter not functional for option “users in same group” (Ref.:BUG_ACE-1447)
      • Bug fix: Add Comments/Add Documents available to user even if access right not granted. (Ref.:BUG_ACE-1449)
      • Bug fix: Project not preserved if filter applied on “Add Recurrence” page. (Ref.:BUG_ACE-1452)
      • Bug fix: Time and Expense reports back button returns fields with dates entered instead of empty. (Ref.:BUG_ACE-1456)
      • Bug fix: Time and Expense status choice remains even if module deactivated. (Ref.:BUG_ACE-1459)
      • Bug fix: Display of time clock incorrect when Administrator deactivates time module. (Ref.:BUG_ACE-1480)
      • Bug fix: Time item not displayed for user that was un-assigned from project. (Ref.:BUG_ACE-1482)
      • Bug fix: A user with Can open project user right not able to lock project document. (Ref.:BUG_ACE-1487)
      • Bug fix: Actual dates not changing when bulk update of task statuses. (Ref.:BUG_ACE-1493)
      • Bug fix: Timeout when opening the export page for large accounts. (Ref.:BUG_ACE-1500)
      • Bug fix: After default page to open selected, choice not conserved. (Ref.:BUG_ACE-1504)
      • Bug fix: Bulk update of task dates has an offset applied is certain circumstances. (Ref.:BUG_ACE-1505)
      • Bug fix: Approved Time items modifiable from the time entry grid. (Ref.:BUG_ACE-1506)
      • Bug fix: Preview link missing for bmp document type. (Ref.:BUG_ACE-1512)
      • Bug fix: Timeclock error when activated on a completed task in the mobile application. (Ref.:BUG_MOB-299)
      • Bug fix: Erroneous error messages when session timeout on mobile application. (Ref.:BUG_MOB-300)
      • Bug Fix: User field missing from Edit Expense page. (Ref.:DEV_ACE-394)
2014-04-03
      • Enhancement: Allow the edition of document name, version, and details within the task documents section. (Ref.:DEV_ACE-359)
      • Enhancement: New time managment settings dialogue with multiple new parameters. (Ref.:DEV_ACE-360)
      • Enhancement: Management of time and expense status added (Ref.:DEV_ACE-361)
      • Enhancement: Project Manager can now modify/add Task Status, Group, Type, Priority from the edit task page. (Ref.:UX-71)
      • Enhancement: Support document name, version, and description changes within the history trail. (Ref.:DEV_ACE-384)
      • Enhancement: A Start/Stop timer is now available from the Edit Task page (Ref.:UX-63)
      • Modification: Header section of project document page now resembles the task document page header section after a document is uploaded. (Ref.:DEV_ACE-379)
      • Modification: Terminology for cancelling an action changed throughout application. (Ref.:UX-68)
      • Modification: Text size has been modified in a number of places such as the personnal notepad. (Ref.:UX-72)
      • Bug fix: When a user is deactivated but still has time to be approved, upon opening the time item in the Time Approval section the page crashes. (Ref.:BUG_ACE-1434)
      • Bug fix: No vertical scrollbars on project document notification dropdown. (Ref.:BUG_ACE-1436)
      • Bug fix: Add time option sometimes diappears when editing a task. (Ref.:BUG_ACE-1437)
      • Bug fix: When in a project task list and then click on the timeclock, user is supposed to be driven to the Home section. (Ref.:BUG_ACE-1438)
      • Bug fix: Default time type is not selected when starting a timeclock from the edit task page. (Ref.:BUG_ACE-1441)
      • Bug fix: When editing a recurrence the default value placed is incorrect. (Ref.:BUG_ACE-1442)
      • Bug fix: When creating a new task and after adding a document a quick comment is not able to be added. (Ref.:BUG_ACE-1444)
      • Bug fix: Timeclock error when activated on a completed task in the mobile application. (Ref.:BUG_MOB-299)
      • Bug fix: Erroneous error messages when session timeout on mobile application. (Ref.:BUG_MOB-300)

2014-02-18
      • Enhancement: A Start/Stop timer is now available from the Edit Task page (Ref.:UX-63)
      • Enhancement: Add document button added to Home -> Document (Ref.:DEV_ACE-364)
      • Enhancement: Deletion of multiple tasks in bulk from different projects from Home > Tasks page with adequate user rights. (Ref.:DEV_ACE-365)
      • Enhancement: Deletion of multiple Projects in bulk from Home > Project list with adequate user rights. (Ref.:DEV_ACE-367)
      • Improvement: Icons in document list change with document type, .docx added. (Ref.:DEV_ACE-373)
      • Improvement: Using the New Project function in the Add Project (+) feature, when a name is entered it will automatically pass the name in the new project creation Name field. (Ref.:DEV_ACE-375)
      • Improvement: The Edit Task form settings are now stored in the database (Ref.:DEV_ACE-378)
      • Improvement: Access right “Can Re-open closed task” is now reserved for Project Manager (right removed from Full). (Ref.:BUG_ACE-1416)
      • Bug fix: Export of the Time Report not working with certain configurations. (Ref.:BUG_ACE-1402)
      • Bug fix: In the Time Report, the date format is not conserved when user uses “back” (Ref.:BUG_ACE-1410)
      • Bug fix: Error when deleting a project. (Ref.:BUG_ACE-1411)
      • Bug fix: Print button at bottom of gantt page should be removed (can only print image). (Ref.:BUG_ACE-1413)
      • Bug fix: Notification opened in Outlook 2013 has a visual artifact within it. (Ref.:BUG_ACE-1415)
      • Bug fix: Available fields not displaying in Show/hide when first opened. (Ref.:BUG_ACE-1417)
      • Bug fix: Bulk change/addition of Comments does not function if it is the only option selected. (Ref.:BUG_ACE-1418)

2014-01-29
      • Enhancement: Simplified User Right categories. (Ref.:DEV_ACE-139)
      • Enhancement: Project Manager now has right to multiple task assignment functionality from right pane on Edit Project -> Assignments page. (Ref.:DEV_ACE-335)
      • Enhancement: No more conflicts when multiple users commenting on the same task at the same time. (Ref.:UX-44)
      • Enhancement: Making the project number optional was ported to the mobile version. (Ref.:BUG_MOB-296)
      • Modification: Icons throughout the application have been revamped. (Ref.:DEV_ACE-369)
      • Modification: Actual Hours shown within email notification if account Time Module enabled, even if module is deactivated for the recipient. (Ref.:DEV_ACE-363)
      • Bug fix: Highlight of text found not working for search results. (Ref.:BUG_ACE-1389)
      • Bug fix: Time item not listed in the Time Report but used in the total hours in certain situations. (Ref.:BUG_ACE-1391)
      • Bug fix: Item “Add Expense” not visible when activating Expenses Module. (Ref.:BUG_ACE-1395)
      • Bug fix: Entering expenses in assigned projects not possible with Read Only access rights. (Ref.:BUG_ACE-1397)
      • Bug fix: Apostrophes in account usernames does not allow working in AceProject. (Ref.:BUG_ACE-1398)
      • Bug fix: Tooltip not opening on document lock icon. (Ref.:BUG_ACE-1399)
      • Bug fix: On creation of a new user and Assigning to multiple projects brings up an error. (Ref.:BUG_ACE-1400)
      • Bug fix: Export of the Time Report not working with certain configurations. (Ref.:BUG_ACE-1402)
      • Bug fix: Limited User does not have the right to make his own document private/public. (Ref.:BUG_ACE-1403)
      • Bug fix: Loss of entered data when error on concurrent task modification. (Ref.:BUG_ACE-1404)
      • Bug fix: An error occurs when a date is entered manually in the Custom Task Report and it is less than 7 characters. (Ref.:BUG_ACE-1406)

2014-01-15
      • Enhancement: Update estimated dates in bulk has been added to “Update selected tasks…” dialogue. (Ref.:DEV_ACE-350)
      • Enhancement: Recent projects section has been added to various combo/selection drop-downs to facilitate access to projects. (Ref.:DEV_ACE-352)
      • Enhancement: JQuery pop-up edit box added on the Edit User screen in the Administration>Users section. (Ref.:DEV_ACE-354)
      • Enhancement: Drop-down enhanced (filtering now possible) when selecting a predecessor task in the dependency page. (Ref.:DEV_ACE-355)
      • Enhancement: Project number optional was ported to the mobile version. (Ref.:BUG_MOB-296)
      • Bug fix: Downgrading yourself from an Administrator to Normal User will now direct you out of the Administration area on update. (Ref.:BUG_ACE-456)
      • Bug fix: Project name not reflected upon changing and updating it from the Edit Project page. (Ref.:BUG_ACE-652)
      • Bug fix: Accents in project names not recognized in filter when accents not used. (Ref.:BUG_ACE-1148)
      • Bug fix: Time entry page freezing when entering time on certain browsers. (Ref.:BUG_ACE-1311)
      • Bug fix: Two x’s are displayed when focus is placed on the date field in certain browsers (Ref.:BUG_ACE-1363)
      • Bug fix: Custom Task Report parameters not conserved when trying to save when the name field is empty. (Ref.:BUG_ACE-1367)
      • Bug fix: When creating a new project, the focus of the cursor in not in the Project Name field. (Ref.:BUG_ACE-1370)
      • Bug fix: Open dialogue does not open in IE8 when using the Browse button for adding documents. (Ref.:BUG_ACE-1372)
      • Bug fix: Display of Time Items entry screen not displaying correctly when tags used in task summary. (Ref.:BUG_ACE-1374)
      • Bug fix: Formatting not applied when using the Printer Version function. (Ref.:BUG_ACE-1377)
      • Bug fix: Link to help page not directing user to proper place on certain pages. (Ref.:BUG_ACE-1378)
      • Bug fix: During a document upload within Chrome on a Mac, the progress (%) does not display. (Ref.:BUG_ACE-1379)
      • Bug fix: When creating a new project using a template, the “Link” option is not selected by default. (Ref.:BUG_ACE-1381)
      • Bug fix: Tool-tip missing information for assignments on the edit task page. (Ref.:BUG_ACE-1384)
      • Bug fix: Time items proposed heading is displayed when no time items for the week are present. (Ref.:BUG_ACE-1388)
      • Bug fix: The sub-menu of the Save button is expanded upon creation of a new project. (Ref.:BUG_ACE-1390)

2013-12-12
      • Enhancement: A quicklink has been added to the Edit Project page to be copied and referenced to open a project directly. (Ref.:DEV_ACE-1035)
      • Modification: When user deletes a comment, all entered information within the task is retained. (Ref.:BUG_ACE-1357)
      • Modification: Delete Project dialogue adjusted to case where Time sheet and Expense modules are disabled. (Ref.:BUG_ACE-1358)
      • Modification: When creating a new Project from a template, the task number is reinitialized to 1 if no tasks were copied from the template. (Ref.:BUG_ACE-1351)
      • Modification: New Project page now proposes to create a project from a template by default. (Ref.:DEV_ACE-345)
      • Modification: Auto-assign Project Number on New Project now done on Save action. (Ref.:DEV_ACE-346)
      • Bug fixed: Ordering by the Priority field in Custom Task Reports is not descending by Urgent,High,Normal,Low (Ref.:BUG_ACE-1034)
      • Bug fixed: Sorting order items in Show/Hide columns dialogue do not refresh correctly (Ref.:BUG_ACE-1069)
      • Bug fixed: Time sheet and Expense module items not appearing when selected in Edit Account page. (Ref.:BUG_ACE-1304)
      • Bug fixed: Missing links on right panel within Edit Project> Tasks tab. (Ref.:BUG_ACE-1324)
      • Bug fixed: Document is not added when using drag and drop in IE11 and user places document on the “Browse…” button. (Ref.:BUG_ACE-1327)
      • Bug fixed: The scroll bar on the Edit User page is not always appearing using IE10. (Ref.:BUG_ACE-1328)
      • Bug fixed: Not able to browse and update with a new logo when using IE11. (Ref.:BUG_ACE-1329)
      • Bug fixed: When creating a project using a template and then creating a blank project afterwards produces an error. (Ref.:BUG_ACE-1335)
      • Bug fixed: When selecting multiple tasks for an update that include completed tasks, an error occurs. (Ref.:BUG_ACE-1338)
      • Bug fixed: Filters for task multi-update page are not conserved after clicking on apply. (Ref.:BUG_ACE-1339)
      • Bug fixed: Estimated Start Date field in the project list is not displaying when changing column order using Show/Hide columns. (Ref.:BUG_ACE-1341)
      • Bug fixed: Expandable section in many pages loses the arrow icon when collapsed. (Ref.:BUG_ACE-1342)
      • Bug fixed: Project number error when creating a project with the number already in use by another user before project has been saved. (Ref.:BUG_ACE-1343)
      • Bug fixed: Move task right panel is not open by default, so no action can be taken. (Ref.:BUG_ACE-1345)
      • Bug fixed: Project status filter does not work in the Expense Approval page. (Ref.:BUG_ACE-1347)
      • Bug fixed: Loss of entered information in Edit Task page when an error occurs due to 2 users editing at the same time. (Ref.:BUG_ACE-1349)
      • Bug fixed: Button “Add a Task to this Project…” is missing from Calendar page. (Ref.:BUG_ACE-1350)
      • Bug fixed: Icons bar in Edit Task page missing in IE8. (Ref.:BUG_ACE-1353)
      • Bug fixed: Create task by email error when adding to a project with no default status type set. (Ref.:BUG_ACE-1354)
      • Bug fixed: The link of a task disappears while trying to copy using FireFox. (Ref.:BUG_ACE-1355)
      • Bug fixed: “Fields to display” in the Show/Hide columns dialogue box freezes when clicking Reset. (Ref.:BUG_ACE-1360)
      • Bug fixed: When assigning yourself using the multi-assign functionality, the application freezes. (Ref.:BUG_ACE-1362)
      • Bug fixed: The “All completed statuses” filter is not conserved when deleting a task unless using the Remember filter function. (Ref.:BUG_ACE-1365)
      • Bug fixed: Email notification not received for nth user added to a project in certain circumstances. (Ref.:BUG_ACE-1366)
      • Bug fixed: Estimated End date not defaulting to at least the Estimated Start date when selecting through the calendar function. (Ref.:UX-60)

2013-11-26
      • Enhancement: Add a task to a project via email.  Each project has a unique email address. (Ref.:DEV_ACE-324)
      • Enhancement: You can now attach a document to a task when sending a ReplyTo from an AceProject notification email. (Ref.:DEV_ACE-320)
      • Enhancement: “My Personal Notes” notepad is now available from all screens and is located beside the Time Clock icon in the top frame (Ref.:DEV_ACE-313)
      • Enhancement: New edit screens for pages such as: project types, project priorities, project statuses, and time types in the Administration > Configuration section. (Ref.:DEV_ACE-334)
      • Enhancement: Batch update of tasks has been improved. For example, a project manager can now assign a user to multiple tasks within the new “Update selected tasks…” dialogue. (Ref.:DEV_ACE-917)
      • Modification: Account Status page modified and is now the default entry page for the Administration section. (Ref.:DEV_ACE-333)
      • Modification: Auto-assign task number on new task now done on save action. (Ref.:DEV_ACE-344)
      • Bug fixed: Export of time report with multiple filters selected does not function correctly. (Ref.:BUG_ACE-1242)
      • Bug fixed: Timesheet export with comma instead of default semi-colon now functions normally (Ref.:BUG_ACE-1252)
      • Bug fixed: User identity of a document is lost when moved from one folder to another. (Ref.:BUG_ACE-1254)
      • Bug fixed: When adding a document to a project, the list of users notified includes those not having access to the document (Ref.:BUG_ACE-1258)
      • Bug fixed: If an error with EditCompany.asp, the recurrence checkbox is always unchecked even if it was checked before the error (Ref.:BUG_ACE-1264)
      • Bug fixed: Custom task report multi copy producing error. (Ref.:BUG_ACE-1266)
      • Bug fixed: Time and cost tracking options are not all hidden if deactivated at the account level (Ref.:BUG_ACE-1269)
      • Bug fixed: Option to hide HMTL code when exporting a custom task report missing (Ref.:BUG_ACE-1271)
      • Bug fixed: Calendar truncated when new dates adjusted for dependent tasks (Ref.:BUG_ACE-1280)
      • Bug fixed: Successor task could start even though all predecessor tasks are not completed. (Ref.:BUG_ACE-1281)
      • Bug fixed: Custom task report columns are not aligned with column content (Ref.:BUG_ACE-1283)
      • Bug fixed: Option “Export only On-screen Columns Only” from users page not filtering columns (Ref.:BUG_ACE-1284)
      • Bug fixed: Actual start time, actual end time and percentage done not displaying for users with read-only access rights in the Edit Task page. (Ref.:BUG_ACE-1287)
      • Bug fixed: Logos and other graphics from email signature are added to the task as documents when using the ReplyTo task in Outlook 2010 (Ref.:BUG_ACE-1290)
      • Bug fixed: In the User Directory when sorting with certain filters selected, an error occurs. (Ref.:BUG_ACE-1294)
      • Bug fixed: When exporting a project list, the parent/child column does not contain information. (Ref.:BUG_ACE-1298)
      • Bug fixed: Error message when trying to deactivate your own account. (Ref.:BUG_ACE-1305)
      • Bug fixed: API error when exporting time and expense reports with certain time formats (Ref.:BUG_ACE-1306)
      • Bug fixed: Navigating back from the time report, filters do not keep their values (Ref.:BUG_ACE-1308)
      • Bug fixed: Task descriptions not always appearing on opened task within the mobile version (Ref.:BUG_ACE-1309)
      • Bug fixed: Right panel hidden on edit forms that require it to perform an action (Ref.:BUG_ACE-1312)
      • Bug fixed: Project status dialogue items not appearing when using IE9. (Ref.:BUG_ACE-1314)
      • Bug fixed: Task reminder emails with no content received when reviewer on tasks (Ref.:BUG_ACE-1319)
      • Bug fixed: Problem when importing users with the task reminder field containing certain values (Ref.:BUG_ACE-1320)
      • Bug fixed: When user assigned to only one project, can not copy a task within the same project using move/copy function. (Ref.:BUG_ACE-1323)

2013-10-24
      • Enhancement: Time report configurations now stored in the database rather than in cookies. (Ref.:BUG_ACE-1239)
      • Enhancement: Task Reminder settings added in Edit my Profile page. A user can now select whether he/she wants to see only assigned, only to-review or both categories of tasks. (Ref.:DEV_ACE-297)
      • Modification: “Manage the list contents” link added to Task Reminder e-mail. Clicking on this link sends you to your “Edit my profile” page task reminder configuration area. (Ref.:DEV_ACE-328)
      • Modification: Print and full-screen icons relocated immediately left of right pane. (Ref.:BUG_ACE-1195)
      • Modification: Line spacing reduced in rich text fields (Details and Comments). (Ref.:BUG_ACE-1247)
      • Modification: Administration => Account > Edit Account screen Task Reminder settings clarified. (Ref.:DEV_ACE-325)
      • Bug fixed: Some e-mails are not including all the modifications that were performed on the task. (Ref.:BUG_ACE-1240)
      • Bug fixed: “Project doesn’t exist…” error message when trying to change a user from Normal to Administrator. (Ref.:BUG_ACE-1245)
      • Bug fixed: Colons (“:”) in document Description field stripped after upload. (Ref.:BUG_ACE-1249)
      • Bug fixed: AceProject logo instead of client logo appearing in e-mail notifications . (Ref.:BUG_ACE-1257)
      • Bug fixed: Under certain circumstances, some users get a technical error when they try to modify their preferences under Edit my Profile (avatar in top right hand corner of screen). (Ref.:BUG_ACE-1261)
      • Bug fixed: Project Manager not able to change the task a time item is associated with in time approval area. (Ref.:BUG_ACE-1263)
      • Bug fixed: “Task Auto Assignment” column missing in user’s “My Access Rights” view. (Ref.:DEV_ACE-315)

2013-10-03
      • Enhancement: Task documents can now be uploaded directly on the main task Edit screen. The “Quick Upload” option is located in the right pane. (Ref.:DEV_ACE-305)
      • Enhancement: Right-click in the column headers area of project and task lists brings up the Show/Hide Columns option.
      • Enhancement: When a user selects the “Copy a project from this template” option, AceProject automatically sets the “Project Template” value to “No”. (Ref.:BUG_ACE-1216)
      • Enhancement: Time Clock time item can now be copied as a “normal” time item. (Ref.:DEV_TSH-21)
      • Enhancement: Improved control over the “Summary” column width in task lists. Less horizontal space is wasted when few columns are displayed in “Custom View”. (Ref.:BUG_ACE-1211)
      • Enhancement: User workload reports now show cell background color in red when user is overallocated. (Ref.:BUG_ACE-1212)
      • Enhancement: Export number of lines limit increased from 15,000 to 25,000. (Ref.:BUG_ACE-1217)
      • Modification: “My Marked Tasks” and “My Marked Projects” pages now also display completed tasks by default. (Ref.:BUG_ACE-1145)
      • Modification: Time report export icon moved to export results screen. Users must 1st generate report on screen and then export. (Ref.:DEV_ACE-299)
      • Modification: Expense report export icon moved to export results screen. (Ref.:DEV_ACE-309)
      • Bug fixed: “Out of range” data error messages in user import template file. Both template files are now dynamically generated using current data in the user’s account to prevent this problem from occurring again in the future. (Ref.:BUG_ACE-898)
      • Bug fixed: Errors in expense download links in multiple areas of the application. (Ref.:BUG_ACE-1116)
      • Bug fixed: Project list export not properly taking the filtering into account. (Ref.:BUG_ACE-1126)
      • Bug fixed: On exports, checking “Remove HTML tags” does not remove HTML tags in certain fields. (Ref.:BUG_ACE-1127)
      • Bug fixed: The “Child Projects” number between parentheses does not exclude child projects that have been deleted and are pending permanent deletion. (Ref.:BUG_ACE-1144)
      • Bug fixed: When a user clicks on a private Project Document download link in an e-mail notification and user authentication on the login page is required, the document download does not start automatically. (Ref.:BUG_ACE-1149)
      • Bug fixed: Visual and behavior glitches in old versions of Internet Explorer corrected. (Ref.:BUG_ACE-1161)
      • Bug fixed: Static templates appearing in the “+” button, project Gantt and project list pages, regardless of the “Include static templates” option value. (Ref.:BUG_ACE-1182)
      • Bug fixed: “Browse” button appears over the document preview. (Ref.:BUG_ACE-1184)
      • Bug fixed: Export “File is corrupt and cannot be opened” error. (Ref.:BUG_ACE-1187)
      • Bug fixed: No vertical space between “Details” and “Comment” field “paragraphs” in task lists. (Ref.:BUG_ACE-1198)
      • Modification: Improved handling of situations where a Normal user is upgraded to Administrator. (Ref.:BUG_ACE-1200)
      • Bug fixed: Timeclock Start and End times cannot be moved to another date. (Ref.:BUG_ACE-1201)
      • Bug fixed: Custom task report export file “Comments” column is empty. Comments are not exported. (Ref.:BUG_ACE-1205)
      • Bug fixed: “Task” field is not automatically populated when selecting “Start Time Clock” in task Edit screen. (Ref.:BUG_ACE-1207)
      • Bug fixed: Unable to apply formulas on time report export hour columns. (Ref.:BUG_ACE-1213)
      • Bug fixed: Home > Tasks page “All Assigned Projects” filtering option not working. (Ref.:BUG_ACE-1215)
      • Bug fixed: E-mail notifications showing “h” instead of “0,00 h” for Actual Hours field. (Ref.:BUG_ACE-1219)
      • Bug fixed: Error when selecting “Save + Assign to multiple projects” user profile option. (Ref.:BUG_ACE-1223)
      • Bug fixed: AceProject freezing and generating errors on My Time screen. (Ref.:BUG_ACE-1224)
      • Bug fixed: Time Clock “Start Time” field days displayed in French in English interface. (Ref.:BUG_ACE-1227)
      • Bug fixed: Expense list page “Expense Date” column header sorting not working. (Ref.:BUG_ACE-1229)
      • Bug fixed: Data in a task list export is not sorted the same way it appears on screen. (Ref.:BUG_ACE-1231)
      • Bug fixed: Project Document upload page “Check All” column header checkbox not working. (Ref.:BUG_ACE-1232)

2013-09-10
      • Enhancement: Time report “Day” view export now only shows one day of a time item per line and a Date column. (Ref.:DEV_ACE-307)
      • Enhancement: Various export file auto-formatting for easier post-export handling of data. (Ref.:DEV_ACE-307)
      • Enhancement: Users can now edit their timeclock start and end times through the “Stop + Open Time Clock Item” option. (Ref.:DEV_HOR-1)
      • Enhancement: Time reports adjusted to take into account the modifications to the timeclock system. The “Time Clock” field will display the final (adjusted) start and end times whereas the “Original Time Clock” field will indicate the original start and end times, if different from the adjusted times. (Ref.:DEV_HOR-1)
      • Enhancement: “Active Time Clock” screen now includes “Level of Progress” section which displays user and total elapsed and remaining hours on the corresponding task. (Ref.:DEV_HOR-1)
      • Enhancement: Timeclock system now allows users to edit the Project, Task, Time Type, Comment fields as well as move back the Start time and remain on the “Active Time Clock” screen. (Ref.:DEV_HOR-1)
      • Enhancement: Existing custom task reports may now be copied in the custom task report list screen. (Ref.:DEV_RAP-1)
      • Enhancement: A user can now select his/her “Favorite” custom task report. The Home tab default page can be set to your favorite custom task report for quick access. (Ref.:DEV_RAP-1)
      • Enhancement: Ability to exclude or capture only “Static Template” tasks in custom task reports added. (Ref.:DEV_RAP-1)
      • Enhancement: Custom task report creation and update information now provided both in the report list and edit screens. (Ref.:DEV_RAP-1)
      • Enhancement: “Update” button “+ Continue editing” and “+ Return to report list” options added in custom task report Edit screen. (Ref.:DEV_RAP-1)
      • Enhancement: “Public”, “Private” and “Administrator” custom task report “Access Types” created. Reports listed will now depend on the report access type and your user access level (Normal or Administrator). (Ref.:DEV_RAP-1)
      • Enhancement: “Remember filters” checkbox added on Administration => Users > Users page. (Ref.:DEV_ACE-286)
      • Enhancement: “Remember filters” checkbox added on Home => More > Directory page. (Ref.:DEV_ACE-287)
      • Enhancement: Drop-down options and project assignment list order adjustments. From now on, clicking on the new “Reset the list order” button will remove all Order numbers and items will be listed in alphabetical order. If Order numbers are provided for one or several items in the list, these will appear 1st (by Order number) followed by non-ordered items in alphabetical order. (Ref.:DEV_ACE-155)
      • Enhancement: Further rich text tools enabled for task “Details”, task “Comments” and project forum reply “Message” fields. (Ref.:BUG_ACE-1158)
      • Enhancement: Mobile version timeclock task drop-down now contains 3 groupings (“Recent Tasks”, “Assigned and to Review” and “Other Tasks”). (Ref.:BUG_MOB-187)
      • Enhancement: Adding and editing projects now available in mobile version. (Ref.:BUG_MOB-218)
      • Enhancement: Getting Started tutorial added on Dashboard page. (Ref.:DEV_ACE-255)
      • Application performance: Exports of more than 1000 lines are now performed in the background. An e-mail containing an export file download link is sent to the user once the export file is ready. (Ref.:DEV_ACE-307)
      • Modification: Summary field column widths in task lists reduced. Long task summaries are now displayed on 2 lines. (Ref.:BUG_ACE-777)
      • Modification: When a user’s Time Entry option is set to “Time Clock only”, the “Show proposed time items” option in the right pane will not be displayed as it is superfluous. (Ref.:DEV_ACE-270)
      • Modification: By default, AceProject will now create new projects as Dynamic Templates. By the same token, in the New Project screen “Copy a project from this template” drop-down, Static Templates will be listed before Dynamic Templates. (Ref.:DEV_ACE-992)
      • Modification: “Remove HTML tags” checkbox removed from user, time and project export pop-up windows. (Ref.:DEV_ACE-302)
      • Modification: To avoid confusion, the dashboard “Total Hours for this Week” number now includes rejected hours, as the total on the My Time page also does.(Ref.:BUG_ACE-1041)
      • Bug fixed: Project Gantt chart PNG export no longer truncated when there are many projects. (Ref.:BUG_ACE-870)
      • Bug fixed: Show/Hide Columns window not displaying all elements when the icon is clicked multiple times. (Ref.:BUG_ACE-964)
      • Bug fixed: Show/Hide Columns window display issues. For instance, the “Fields to display” field sometimes is empty when, in fact, the user has many columns displayed. (Ref.:BUG_ACE-964)
      • Bug fixed: Custom task reports show Task Group, Task Type, Task Priority and Task Status values in the filters from projects the user is not assigned to. (Ref.:BUG_ACE-974)
      • Bug fixed: Improper rescheduling of downstream tasks when the Estimated End Date of the task is pushed out. (Ref.:BUG_ACE-995)
      • Bug fixed: Some users do not have a default page defined for the Home tab. A script was run to set these users’ default page to Dashboard. (Ref.:BUG_ACE-1109)
      • Bug fixed: Certain administrators did not have the “Can add expense” right. A script was run to remedy the situation. (Ref.:BUG_ACE-1113)
      • Bug fixed: E-mail notifications not correctly replacing the “Application Name” variable with its value. (Ref.:BUG_ACE-1143)
      • Bug fixed: Certain characters in the task Summary field are not correctly rendered in the Task drop-down when creating a new time item. (Ref.:BUG_ACE-1151)
      • Bug fixed: My Time icon in mobile version does not always return the user to the current day. (Ref.:BUG_MOB-272)
      • Bug fixed: “Export on-screen columns only” option not working in various data exports. (Ref.:DEV_ACE-307)
      • Bug fixed: Exports showing all items instead of only the filtered items. (Ref.:DEV_ACE-307)

2013-07-16
      • Bug fixed: Timeclock system not working properly in newly created accounts. (Ref.:BUG_ACE-1129)

2013-06-25
      • Enhancement: Time Module now can be disabled at the account and user levels. When the Time Module is disabled, the left menu and top frame pulldowns no longer display items related to the time module. Additionally, when the time module is disabled, all Actual Hours in the interface and e-mail notifications are hidden.(Ref.:DEV_ACE-253)
      • Enhancement: “New User”, “Edit User” and “My Profile” pages now contain “Can use the time module” and “Can use the expense module” blocks in the Access Rights section.(Ref.:DEV_ACE-262)
      • Enhancement: The “Can see financial data” right has been renamed to “Can see expense data no matter what” and moved into the “Can use the expense module” block thus making things clearer from a user configuration standpoint. (Ref.:DEV_ACE-262)
      • Enhancement: Estimated Project Hours and Estimated Average % Done columns added in project list “Time View”. (Ref.:DEV_ACE-276)
      • Enhancement: “Update” section added in the right panel on the project task list screen. This allows you to update multiple values (Task Group, Task Type, Task Priority and Task Status) and be certain of the new values the selected tasks will be associated with. This section also allows you to add the same quick comment on multiple tasks. (Ref.:DEV_ACE-159)
      • Enhancement: “User” task list filter section added. The “Or” logical operator now supported in this new filter section. (Ref.:DEV_ACE-197)
      • Modification: Right panel behavior changed in My Time area. (Ref.:BUG_ACE-1047)
      • Modification: Summary of user’s access rights in “My Profile” clarified. (Ref.:DEV_ACE-275)
      • Modification: Sort order of tasks in drop-down standardized. Tasks are now listed by Task Number, in descending order so that the most recent tasks appear 1st. (Ref.:BUG_ACE-1004)
      • Terminology modification: “Team” replaced by “User Directory” or “Directory”. (Ref.:DEV_ACE-267)
      • Terminology modification: “Date Format” replaced by “Date and Number Formats”. (Ref.:DEV_ACE-282)
      • Bug fixed: Expense documents that had been uploaded still are displayed when “Cost Tracking” is disabled. (Ref.:BUG_ACE-1015)
      • Bug fixed: “Budget Cost” field still available in the project list Show/Hide Columns window when Cost Tracking is disabled. (Ref.:BUG_ACE-1016)
      • Bug fixed: Internet Explorer 8 users unable to register “.5” in the My Time time cells. Only “0.5” goes through. (Ref.:BUG_ACE-1042)
      • Bug fixed: Task Gantt Chart Show/Hide Columns window “Reset” and “Close” buttons not working properly. (Ref.:BUG_ACE-1045)
      • Bug fixed: Home > Projects exports show all projects rather than only the filters projects. (Ref.:BUG_ACE-1051)
      • Bug fixed: Time Approval area showing two lines for the same user in the same week and My Time page data inconsistencies. (Ref.:BUG_ACE-1052)
      • Bug fixed: Google Chrome crashes when focus is in a My Time time cell and user navigates away from AceProject browser tab. (Ref.:BUG_ACE-1053)
      • Bug fixed: Unable to take away the “Can Open Project” right for certain users. (Ref.:BUG_ACE-1061)
      • Bug fixed: Username missing in “Delete User Items” screen breadcrumb. (Ref.:BUG_ACE-1076)
      • Bug fixed: “My Time” time item line totals and daily totals are rounded off. (Ref.:BUG_ACE-1077)
      • Bug fixed: Auto assigned users cannot be unassigned when creating a new task. (Ref.:BUG_ACE-1081)
      • Bug fixed: Normal users that have not been granted “Can see financial” or “Expense Approval” rights unable to see amount of own expenses in task lists. (Ref.:BUG_ACE-1085)
      • Bug fixed: “Timeclock Only” users unable to delete their time items. (Ref.:BUG_ACE-1089)
      • Bug fixed: Administrators not assigned on a project unable to record time on the project on another’s behalf. (Ref.:BUG_ACE-1093)
      • Bug fixed: When a new user is created, the “Can use time module” and “Can use expense module” are not checked. However, after saving, the checkboxes are checked and the user does indeed have access to these modules. (Ref.:BUG_ACE-1100)

2013-05-24
      • Enhancement: Time item hours can now be edited directly in one’s weekly timesheet (“My Time” page). Clicking on the Status link to view the time item in Edit mode is no longer required for this purpose. (Ref.:DEV_ACE-246)
      • Enhancement: Keyboard Tab, Shift-Tab, Up, Down, Home and End keys allow you to navigate through the time fields in “My Time” page.(Ref.:DEV_ACE-246)
      • Enhancement: “My Time” page now lists “Suggested Time Items” based on projects and tasks the user recorded time on in previous nonzero time weekly timesheet. (Ref.:DEV_ACE-240)
      • Enhancement: “Add time to this project” drop-down now supports project search by keyword. Subsequently, in the “New Time Item” page, the “Task” drop-down also now supports keyword search. (Ref.:DEV_ACE-246)
      • Enhancement: “No Client Specified” and “No User Group Specified” filter options added in custom task reports. (Ref.:DEV_ACE-163)
      • Enhancement: Time Approval “Copy Time Items” and “Delete Time Items” options added. (Ref.:DEV_ACE-228)
      • Enhancement: “Timeclock Only” users can now edit the Task, Time Type and Comment fields on rejected time items. (Ref.:DEV_ACE-247)
      • Enhancement: “Copy +Stay on the current week” option added when copying time items. (Ref.:DEV_ACE-235)
      • Enhancement: Import results report now shows CSV source file line numbers where errors occurred. (Ref.:BUG_ACE-880)
      • Enhancement: Better handling of links to documents in AceProject e-mail notifications. (Ref.:BUG_ACE-890)
      • Enhancement: Better support for 768 pixel height resolutions. (Ref.:BUG_ACE-884)
      • Modification: Timeout value increased to allow import of CSV files containing 500 tasks. (Ref.:BUG_ACE-787)
      • Modification: Time item deletion workflow standardized. Administrators will now have to reject their approved time items before deleting them. (Ref.:DEV_ACE-249)
      • Modification: When lag time is specified, AceProject now uses the date the predecessor task was set to a completed status rather than the Last Update field to determine when the successor may be started. This is to prevent unnecessary delays when a comment is added to the predecessor task after its completion. (Ref.:DEV_ACE-250)
      • Modification: Now that AceProject proposes time items based on projects and tasks the user has recorded time on in his/her previous nonzero hour weekly timesheet, and considering that the previous “Add Time” drop-down structure was confusing, this drop-down now proposes “Recent Projects” first followed by all assigned projects, grouped by Project Type. (Ref.:DEV_ACE-252)
      • Modification: “Add Time” left menu and project tab pulldown menu options now grayed out for administrators that are not assigned to the project. (Ref.:BUG_ACE-975)
      • Modification: When “Cost Tracking” is disabled, the “Financial Views” are no longer available. (Ref.:BUG_ACE-984)
      • Modification: When “Cost Tracking” is disabled, the “Expense Documents” filter option is no longer presented. (Ref.:BUG_ACE-991)
      • Bug fixed: Mailbox message Subject field not properly aligned. (Ref.:BUG_ACE-841)
      • Bug fixed: “Back” in Edit Project page produces ‘ASP 0158 : 80004005’ error. (Ref.:BUG_ACE-843)
      • Bug fixed: Weekly timesheet start and end dates out of phase with Week Management account option for customers in Australia. (Ref.:BUG_ACE-905)
      • Bug fixed: When a user is assigned to one project and no task within it, the “Add Time to this project” drop-down issues “You are currently not assigned to any project” message. (Ref.:BUG_ACE-953)
      • Bug fixed: Show/Hide Columns window not displaying all elements when the icon is clicked multiple times. (Ref.:BUG_ACE-964)
      • Bug fixed: Wrong week displayed when returning back to My Time from the task Edit screen. (Ref.:BUG_ACE-967)
      • Bug fixed: Time report comments being displayed on a single line rather than with line feeds. (Ref.:BUG_ACE-968)
      • Bug fixed: New time items are not coming up with the default time type. (Ref.:BUG_ACE-973)
      • Bug fixed: Task Gantt chart “Sort by” option not working. (Ref.:BUG_ACE-977)
      • Bug fixed: Project discussion forum topic reply e-mail notification user dropdown not correctly grouping users by User Group. (Ref.:BUG_ACE-1000)
      • Bug fixed: Scrolling issue in task lists when using iPads. (Ref.:BUG_ACE-1006)
      • Bug fixed: “You don’t have enough access rights to display this page.” error message occurring at times when filtering the project level task recurrence page. (Ref.:BUG_ACE-1007)
      • Bug fixed: Improper current week start and end dates when adding 1st time item in an account. (Ref.:BUG_ACE-1017)
      • Bug fixed: Mailbox “Users” drop-down indicates “All” by default but no user is actually selected. (Ref.:BUG_ACE-1022)
      • Bug fixed: Time Approval “Remember Filters” option not working. (Ref.:BUG_ACE-1024)
      • Bug fixed: Main frame objects become disabled following a task document download in Firefox. (Ref.:BUG_ACE-1026)
      • Bug fixed: When checking the “Project Manager” project level right, the “Expense Approval” option does not check itself automatically. (Ref.:BUG_ACE-1028)
      • Bug fixed: When clicking on a Custom Task Report filter dropdown, the dropdown does not expand. (Ref.:BUG_ACE-1030)
      • Bug fixed: Entering time directly in the “Proposed Time Items” section our boxes does not work in IE 8. (Ref.:BUG_ACE-1035)
      • Bug fixed: When a user accesses a task through a “My Time” time item Summary link, after updating his/her changes on the task, AceProject returns the user to the My Time page but the time item count is incorrect. (Ref.:DEV_ACE-257)

2013-04-26
      • Modification: Right pane options displayed on page load in My Time screen rather than only after selecting time items. (Ref.:DEV_ACE-245)
      • Modification: E-mail notification checkbox labels standardized. (Ref.:DEV_ACE-203)
      • Modification: Time range date fields moved up to the top of the “Filters” section in time reports pages. (Ref.:DEV_ACE-224)
      • Bug fixed: Number appearing between parentheses in user profile “Assigned Projects” tab is inaccurate. (Ref.:BUG_ACE-929)
      • Bug fixed: “Access Denied” error message occurring when using AceProject “Back” button from task History Trail when working under the Home tab. (Ref.:BUG_ACE-939)
      • Bug fixed: “Show: $.blockUI is not a function” error occurring when selecting a task in the “Add Time” drop-down. (Ref.:BUG_ACE-942)
      • Bug fixed: Column headers missing in task “Dependencies” tab. (Ref.:BUG_ACE-947)
      • Bug fixed: Column headers appearing twice in “My Time” page. (Ref.:BUG_ACE-956)

2013-04-19
      • Enhancement: Selecting Home > Time > My Time automatically opens the user’s current weekly timesheet. (Ref.:DEV_ACE-188)
      • Enhancement: “My Time” added in Home tab default pages options. (Ref.:DEV_ACE-188)
      • Enhancement: Weekly timesheets now created transparently. “Add a New Week” button and “Auto create weeks” option removed. (Ref.:DEV_ACE-188)
      • Enhancement: Timeline navigation tools added in “My Time”. (Ref.:DEV_ACE-188)
      • Enhancement: “Add Time…” drop-down now lists recent projects 1st followed by other assigned projects, grouped by Project Type.(Ref.:DEV_ACE-188)
      • Enhancement: Improved navigation and filter handling when working through the “By Week” time approval view. (Ref.:BUG_ACE-854)
      • Enhancement: When viewing a weekly timesheet, one or several items can be selected and copied onto another week.(Ref.:DEV_ACE-188)
      • Enhancement: “In Progress or Submitted” status filter option added in time approval areas. (Ref.:DEV_ACE-198)
      • Enhancement: When approving time items in “By Item” view, a “+ Back to Weekly View” option is now available on the “Apply” button. (Ref.:DEV_ACE-205)
      • Enhancement: “Time Type” filter added in time approval areas. (Ref.:DEV_ACE-212)
      • Enhancement: Multi-time item deletion added. (Ref.:DEV_ACE-188)
      • Enhancement: “Group” column added under Home > More > Team. (Ref.:DEV_ACE-942)
      • Modification: “My Weekly Time Sheets” left menu item renamed “My Time”. (Ref.:DEV_ACE-188)
      • Modification: “Add time to this project…” button renamed “Add Time…”. (Ref.:DEV_ACE-188)
      • Modification: Adjustments to the default texts that appear in the Project and Task drop downs in the Start Time Clock screen. (Ref.:DEV_ACE-230)
      • Modification: Last item in breadcrumbs now displayed in bold characters. (Ref.:BUG_ACE-912)
      • Modification: “Un-grouped Users” category label added in “Send Approval Request to…” drop-down. (Ref.:DEV_ACE-232)
      • Modification: “My Time” page now displays a message if user is not assigned to any projects. (Ref.:DEV_ACE-233)
      • Modification: Administrators will now have to assign themselves to a project in order to record time through the project or a task therein. (Ref.:BUG_ACE-916)
      • Bug fixed: Filter settings are lost when changes are applied in the project Gantt chart Show/Hide Columns window. (Ref.:BUG_ACE-823)
      • Bug fixed: In the project level time approval area, when a user adds a time item on behalf of another, the project drop-down is enabled. (Ref.:BUG_ACE-869)
      • Bug fixed: Project Gantt chart PNG export no longer truncated when there are many projects. (Ref.:BUG_ACE-870)
      • Bug fixed: Project mismatch issue when editing a user’s project level rights through the user profile. (Ref.:BUG_ACE-877)
      • Bug fixed: Unable to edit values in certain fields in Internet Explorer 8. (Ref.:BUG_ACE-881)
      • Bug fixed: Sorting issue in time reports. (Ref.:BUG_ACE-886)
      • Bug fixed: Top and left frames are lost when clicking on the project reference in the breadcrumb under Project > Time > Time Approval. (Ref.:BUG_ACE-895)
      • Bug fixed: Missing column headers in task documents area. (Ref.:BUG_ACE-900)
      • Bug fixed: Unable to filter on a user in the time approval area if that user is no longer assigned to the project. (Ref.:BUG_ACE-906)
      • Bug fixed: Lists of projects assigned to a user not sorted correctly. (Ref.:BUG_ACE-914)
      • Bug fixed: “Send approval request to” drop-down options not sorted appropriately. (Ref.:BUG_ACE-920)
      • Bug fixed: Language issue in the time approval request e-mail. (Ref.:BUG_ACE-923)
      • Bug fixed: When working through a Home tab task list, if one opens a task and tries to generate a time report for that task by clicking on the Actual Hours field value, the time report does not capture show only time on that specific task. (Ref.:BUG_ACE-934)
      • Bug fixed: “You don’t have sufficient rights…” error when trying to add a time item at the Project level. (Ref.:DEV_ACE-221)

2013-03-26
      • Enhancement: Time Approval Request e-mail now contains a link back to the time approval area where the items submitted for approval will be listed. (Ref.:DEV_ACE-189)
      • Enhancement: Time Approval – By Week view can now be sorted on the “Total” column. (Ref.:DEV_ACE-201)
      • Modification: Several navigation adjustments performed in the time approval areas of the interface. (Ref.:BUG_ACE-852)
      • Modification: Default sorting set to “Week Descending – User Ascending” in all time approval interface areas and views. (Ref.:BUG_ACE-853)
      • Modification: Button label changes in the right pane under the “Assigned Projects” tab in the user profiles. (Ref.:BUG_ACE-807)
      • Modification: The “Quick Comment” field in the right pane of the task Edit screen will no longer be displayed if the user does not have sufficient rights to add a comment on the task. (Ref.:BUG_ACE-820)
      • Modification: Project and task drop downs under Home > Time > My Time Clock now set to “All Projects” and “All Recent Tasks” to improve clarity. (Ref.:BUG_ACE-848)
      • Terminology changed: “Work Item” replaced by “Time Item”. (Ref.:DEV_ACE-200)
      • Bug fixed: Tasks disappear from project task calendar after navigation sequence. (Ref.:BUG_ACE-810)
      • Bug fixed: Project Gantt chart not exporting to PDF correctly. (Ref.:BUG_ACE-824)
      • Bug fixed: In time approval (“By Week” view), when a past week item is opened, the navigation bar does not update itself correctly. (Ref.:BUG_ACE-842)
      • Bug fixed: Project and task dropdowns under Project > Time > Time Report + “New Time Item” not populating correctly. (Ref.:BUG_ACE-844)
      • Bug fixed: Project field displayed as a drop-down rather than as a read only field under Project > Time > Time Report + “New Time Item”. (Ref.:BUG_ACE-847)
      • Bug fixed: Rich text component stripping out the host portion of the URL from links when the host is AceProject. (Ref.:BUG_ACE-851)
      • Bug fixed: “SortOrder parameter value is invalid” error message when attempting to save an expense. (Ref.:BUG_ACE-856)
      • Bug fixed: When a project is set to “Excluding Weekends”, the default Estimated Start Date or Estimated End Date options are set to “Today’s date” or “Next day” and a task is created over the weekend, AceProject will now automatically set the Estimated Start Date or Estimated End Date of the task on the next business day. (Ref.:DEV_ACE-202)

2013-03-15
      • Enhancement: Administrators and project managers can now create time items for other users in time approval areas of the interface. (Ref.:DEV_ACE-176)
      • Enhancement: Time report now supports a 2-level breakdown and allows users to select fields to display. (Ref.:DEV_ACE-180)
      • Enhancement: Daily view added in time report options. (Ref.:DEV_ACE-185)
      • “Show only totals and subtotals” checkbox added in time reports. This allows users to get only totals per breakdown for a summarized view.
      • Enhancement: New project Gantt Chart module. Preset timelines are available at the click of the mouse (without a page refresh), estimated start and end dates may be dragged directly in the Gantt, the headers and left panel remain static, PDF export is now supported. (Ref.:DEV_ACE-190)
      • Enhancement: “Get task link” option added in the task Edit screen to allow users to share the URL of the current task with others for quicker access. (Ref.:DEV_ACE-853)
      • Enhancement: Task auto-assignment option added under Project Tab > Assignments. (Ref.:DEV_ACE-154)
      • Code optimization: Improvements with regards to document download. (Ref.:BUG_ACE-699)
      • Code optimization: Time required for task lists to be returned reduced. (Ref.:BUG_ACE-804)
      • Code optimization: When trying to move a time item, the “Move to another project” page takes a lot of time to load. (Ref.:BUG_ACE-812)
      • Modification: %Done field moved to the right of the Status field in the task Edit screen. (Ref.:BUG_ACE-818)
      • Modification:”Assigned or to Review” added in Dashboard bar chart task categories. (Ref.:DEV_ACE-165)
      • Modification: Default Edit Task Level on project assignments set to D2. (Ref.:BUG_ACE-798)
      • Bug fixed: Sorting issue in time reports. (Ref.:BUG_ACE-779)
      • Bug fixed: When creating a new task recurrence, the Status field value is not retained if an error occurs when attempting to save. (Ref.:BUG_ACE-780)
      • Bug fixed: Code optimization on Start Timeclock page. (Ref.:BUG_ACE-783)
      • Bug fixed: Start Timeclock page task drop-down taking forever to load. (Ref.:BUG_ACE-783)
      • Bug fixed: Inaccurate error message when trying to delete a Time Type which still has time items associated with it. (Ref.:BUG_ACE-790)
      • Bug fixed: Expense reports not pulling up all expenses for admin users who had “Portfolio-Assigned Projects” setting in 5.0. (Ref.:BUG_ACE-791)
      • Bug fixed: Timesheet export under Administration => Tools > Export Data not indicating the correct number of items and inaccurate error message when the count exceeds the maximum number of items authorized. (Ref.:BUG_ACE-799)
      • Bug fixed: The date in the “This user cannot be deleted as he/she is still linked to a project pending for deletion. You have to either wait until dd/mm/yyyy to delete the user or set the user status to “Inactive”. error message is incorrect. (Ref.:BUG_ACE-800)
      • Bug fixed: Project Documents page “Detected changes” pop-up too wide. (Ref.:BUG_ACE-803)
      • Bug fixed: Update button missing in Edit Expense screen when using IE 8. (Ref.:BUG_ACE-806)

2013-02-14
      • Enhancement: “Windows 8” branding theme added. (Ref.:BUG_ACE-536)
      • Enhancement: Links in the task Details and Comment fields are now clickable directly in the Edit screen using Ctrl-click. (Ref.:BUG_ACE-711)
      • Enhancement: Time Clock project and task drop downs now populated based on “recency”. (Ref.:DEV_ACE-181)
      • Bug fixed: “The value or format in ‘filesInfos’ field is incorrect.” error message when trying to move project documents selected using the column header “Check all” checkbox. (Ref.:BUG_ACE-753)
      • Bug fixed: Checkbox appearing in middle of the Administration > Tools > Deleted Projects. (Ref.:BUG_ACE-769)
      • Bug fixed: Inconsistent number of users displayed in the User filters when administrators are generating time and expense reports. (Ref.:BUG_ACE-771)
      • Bug fixed: French values appearing in the Edit Task Level column of English project assignment e-mail notifications. (Ref.:BUG_ACE-773)

2013-02-08
      • Enhancement: Users may now select the fields they wish to see displayed in time reports and specify their sorting criteria. (Ref.:DEV_ACE-175)
      • Enhancement: Date range filters added in Home > Projects. (Ref.:DEV_ACE-174)
      • Modification: Non-PM normal users now able to upload project documents. (Ref.:DEV_ACE-178)
      • Bug fixed: User A gets error on Home tab if user B disables cost tracking during user A’s session. (Ref.:BUG_ACE-721)
      • Bug fixed: Error message on Home > Expenses > My Expenses if user is not assigned to any projects. (Ref.:BUG_ACE-734)
      • Bug fixed: Unable to create a project document folder which contains a dot (“.”) or other special characters. (Ref.:BUG_ACE-739)
      • Bug fixed: Navigation permission issues when using the “Previous Task” and “Next Task” buttons when working under the Home tab. (Ref.:BUG_ACE-747)
      • Bug fixed: “Actions on checked items” section not displaying in the right pane when the “Check all” header checkbox is checked in the project-level “Document Search” page. (Ref.:BUG_ACE-755)
      • Bug fixed: Project and task list page column headers sorting only in ascending order. (Ref.:BUG_ACE-756)
      • Bug fixed: When responding to an email notification, users receive the “Notify me when I create, update or delete a task” e-mail notification although that checkbox is unchecked. (Ref.:BUG_ACE-757)
      • Bug fixed: Issue with vertical scrolling in project-level time reports when “Show Filters” is checked. (Ref.:BUG_ACE-763)
      • Bug fixed: “Unable to download ExportTaskCSV.asp” message when attempting to export tasks for IE8 users. (Ref.:BUG_ACE-765)

2013-01-31
      • Bug fixed: My Time Sheets showing weekly timesheets with inaccurate Global Approval Status because of projects that are pending deletion. (Ref.:BUG_ACE-733)
      • Bug fixed: Interface language issue for Francophone users. (Ref.:BUG_ACE-742)
      • Bug fixed: Unable to create project from a template that contains dependencies under certain conditions. (Ref.:BUG_ACE-743)
      • Bug fixed: Formatting is not fully retained when pasting a Word table into the Details and Comment fields. (Ref.:BUG_ACE-744)
      • Bug fixed: Current weekly timesheet not appearing in My Time Sheets although the week already exists. (Ref.:BUG_ACE-750)
      • bug fixed: Time report export issue in Internet Explorer 8. (Ref.:BUG_ACE-751)
      • Bug fixed: Francophone users with an “é” in their username call their login page and the “é” in the auto populated username is replaced by “é”. (Ref.:BUG_ACE-1180)
      • Bug fixed: Error on Soon Due Tasks and Overdue Tasks pages when tasks are sorted by Estimated End Date. (Ref.:BUG_MOB-245)
      • Bug fixed: Logout not working in the mobile version. (Ref.:BUG_MOB-246)

2013-01-24
      • Enhancement: Custom task reports can now be marked. A link to generate the marked report subsequently appears in the “Marked Custom Task Reports” section of the Dashboard.(Ref.:BUG_ACE-284)
      • Enhancement: Administrators can now apply Show/Hide Columns settings to other users. (Ref.:BUG_ACE-422)
      • Enhancement: Horizontal and vertical scrollbars added for the project document folder tree. (Ref.:BUG_ACE-727)
      • Code optimization: Performance improvements on report exports. (Ref.:BUG_ACE-689)
      • Modification: Indentation options dropped in Details and Comment fields because of text formatting issues. (Ref.:BUG_ACE-682)
      • Bug fixed: Task import not working. (Ref.:BUG_ACE-545)
      • Bug fixed: Administrator getting “You don’t have sufficient rights” message when attempting to record time on a task. (Ref.:BUG_ACE-679)
      • Bug fixed: Global Search and Search Within Project not locating tasks when a decimal number is specified. (Ref.:BUG_ACE-680)
      • Bug fixed: Task level Actual Hours values appearing in task list following the creation of a new project based on a template. (Ref.:BUG_ACE-702)
      • Bug fixed: Empty SupportingDocument field on expense exports when, in fact, a supporting document has been uploaded against the expense. (Ref.:BUG_ACE-708)
      • Bugs fixed: JavaScript error on Weekly Timesheet and Time Approval > By Week pages. (Ref.:BUG_ACE-709)
      • Bug fixed: If user’s “Team – User List” setting is set to “Users in the same group”, he/she has issues accessing the Team page or receives an error when about to compose a Mailbox message . (Ref.:BUG_ACE-710)
      • Bug fixed: When creating a new project, AceProject returns an error saying that the auto generated project number already exists. (Ref.:BUG_ACE-712)
      • Bugs fixed: Certain successor tasks had estimated start dates prior to their predecessor’s estimated start dates. (Ref.:BUG_ACE-720)
      • Bug fixed: Drop-down width needs to be increased for Internet Explorer 8 users. (Ref.:BUG_ACE-725)
      • Bug fixed: JavaScript error on “Get download link” pop-up under Home > Documents. (Ref.:BUG_ACE-726)
      • Bug fixed: When a user has not yet been assigned any projects or tasks uses the Global Search, an error occurs. (Ref.:BUG_ACE-732)
      • Bug fixed: When adding a supporting document to an existing expense, the Task and Comments field contents are lost. (Ref.:BUG_ACE-736)

2012-12-19
      • Enhancement: “No assigned user” and “No reviewer” options added in custom task report user filters. (Ref.:DEV_ACE-162)
      • Enhancement: Tooltip added over right pane filters in list pages. (Ref.:DEV_ACE-166)
      • Enhancement: Project Managers now allowed to delete projects they have created. (Ref.:DEV_ACE-830)
      • Enhancement: If one clicks on the current active project tab in the top frame, AceProject no longer reloads all 3 frames but only the main frame. (Ref.:BUG_ACE-627)
      • Enhancement: “Is empty” option added in the two “Date Range” date filters in Home and Project tab task list pages. (Ref.:BUG_ACE-634)
      • Enhancement: Project assignment/un-assignment/rights update e-mail notifications now indicate the user who performed the action. (Ref.:BUG_ACE-484)
      • Code optimization: Dashboard page statistics code optimized. (Ref.:Ace-Perf-45)
      • Bug fixed: If a user currently viewing the task Edit screen clicks on the right edge of the active Project Tab and selects “Close all but this”, the user is kicked out of the task and the project’s task list page is loaded. (Ref.:BUG_ACE-523)
      • Bug fixed: Under certain circumstances, a user working in the “Multiple Task Assignment” section is inappropriately sent back to the main user profile page upon updating assignments. (Ref.:BUG_ACE-614)
      • Bug fixed: When exporting projects, if “Export On-Screen Columns Only” is not selected, AceProject does not return the Creator field value. (Ref.:BUG_ACE-641)
      • Bug fixed: Users not receiving the “Notify me when…I am assigned or unassigned from a project” e-mail notification upon project assignment. (Ref.:BUG_ACE-642)
      • Bugs fixed: When clicking on the “Username” header in the project assignment list, users are not sorted correctly. (Ref.:BUG_ACE-643)
      • Bug fixed: Dashboard task bar chart labels overlapping in French interface. (Ref.:BUG_ACE-645)
      • Bug fixed: Task update e-mail notifications being sent to users upon document upload even though “Do not notify” is checked. (Ref.:BUG_ACE-648)
      • Bug fixed: New Project page error when selecting “Including Weekends” option. (Ref.:BUG_ACE-649)
      • Bug fixed: Task assignment grid not sorting when clicking on the “User” header in Internet Explorer 8. (Ref.:BUG_ACE-650)
      • Bug fixed: Missing projects in Admin level project export. (Ref.:BUG_ACE-658)
      • Bug fixed: When setting a non-template project to “Dynamic Template”, task recurrences are disabled. (Ref.:BUG_ACE-662)

2012-12-12
      • Enhancement: “Create” button moved to the bottom of the top frame “+” button pulldown in order to avoid having projects created inadvertently when the user actually wanted to open an existing project. (Ref.:BUG_ACE-123)
      • Enhancement: “Remember filters” checkbox added in expense approval areas of the interface. (Ref.:BUG_ACE-640)
      • Enhancement: Project Type, User Group, Task Type and Task Group fields added in Administration => Tools > Export Data and time report exports. (Ref.:BUG_ACE-646)
      • Bug fixed: Task printer version not respecting the number of tasks per page value. (Ref.:BUG_ACE-437)
      • Bug fixed: “Update” button missing in the right pane when updating a user’s project level rights through Administration => Users > Users . (Ref.:BUG_ACE-617)
      • Bug fixed: Improper alignment of dependency and active timeclock icons in task lists. (Ref.:BUG_ACE-631)
      • Bug fixed: When accessing one’s lists of “Created” or “Reviewer on” tasks through the dashboard, the corresponding filters in the right pane are now disabled. (Ref.:BUG_ACE-639)
      • Bug fixed: Project created through the “+” top frame button was defaulting to “Including Weekends” instead of “Excluding Weekends”. (Ref.:BUG_ACE-661)
      • Bug fixed: Typo in the French interface “Accueil” option drop-down, in the user profile page. (Ref.:BUG_ACE-663)
      • Bug fixed: When users clicked on the top frame “+” button when their session had expired, an error was displayed in the pulldown. Now, AceProject simply returns the user to the login page. (Ref.:BUG_ACE-665)
      • Bug fixed: Users getting error messages saying their new project number and name are not unique when, in fact, they are. (Ref.:BUG_ACE-667)
      • Bugs fixed: Under certain circumstances, the number of hours entered by user in a work item is lost when clicking on Save. (Ref.:BUG_ACE-668)
      • Bug fixed: Certain help icons in the interface were opening the corresponding help page in the same browser tab. (Ref.:BUG_ACE-670)
      • Bug fixed: “Remember filters” option in expense and time reports not working if the date range fields are emptied. (Ref.:BUG_ACE-673)
      • Bug fixed: Typo in the breadcrumbs when generating certain expense reports under the Home tab. (Ref.:BUG_ACE-676)

2012-12-06
      • Enhancement: Multi-document uploads and upload progression now supported in Internet Explorer. (Ref.:BUG_ACE-253)
      • Enhancement: “Browse” button now available in IOS 6 devices for document uploads. The “Take Picture” option is supported. (Ref.:BUG_ACE-551)
      • Enhancement: Pie chart replaced with bar chart in user dashboard. (Ref.:BUG_ACE-570)
      • Enhancement: Previous time approval view (“By Week” or “By Item”) now remembered and applied. (Ref.:BUG_ACE-576)
      • Enhancement: Time Approval filters can now be remembered. (Ref.:BUG_ACE-602)
      • Enhancement: A keyboard “Enter” now adds a single line break in HTML fields (task “Details” and “Comments” fields, for example). “Shift-Enter” now adds a paragraph break. (Ref.:BUG_ACE-624)
      • Enhancement: [is empty] operator added in custom task report date line filters. (Ref.:DEV_ACE-161)
      • Enhancement: As you’re typing in the “+” button’s “Filter Project List” field, AceProject progressively filters and suggests matching project names. Now, if you press the Enter key on your keyboard, AceProject will open the 1st project in the list of suggested projects. (Ref.:BUG_ACE-593)
      • Bug fixed: Missing “Back” button in Edit Expense page when the selected expense has been approved. (Ref.:BUG_ACE-256)
      • Bug fixed: Missing “Order” column in project assignments page. (Ref.:BUG_ACE-494)
      • Bug fixed: Project Type and Client filters missing in Home tab task list, calendar and Gantt chart pages. (Ref.:BUG_ACE-519)
      • Bug fixed: Empty right pane when viewing Edit Project and New Expense pages in Internet Explorer 8. (Ref.:BUG_ACE-588)
      • Bug fixed: Unhandled error when a user clicks on a project tab in the top frame if that project has been deleted by another user. (Ref.:BUG_ACE-615)
      • Bug fixed: If a user requests page 0 in the navigation section at the bottom of a list page, AceProject will now display page 1 instead of returning an error. (Ref.:BUG_ACE-616)
      • Bug fixed: “Update” button missing in the right pane when updating a user’s project level rights on a project through Administration => Users > Users . (Ref.:BUG_ACE-617)
      • Bug fixed: User workload report page not displaying the right pane filters. (Ref.:BUG_ACE-625)
      • Bug fixed: Breadcrumb issue when a custom task report’s name contains accents. (Ref.:BUG_ACE-628)
      • Bug fixed: Improper alignment of dependency and active timeclock icons in task lists. (Ref.:BUG_ACE-631)
      • Bug fixed: Missing scrollbar in right pane filter drop-down if the filter is too wide. (Ref.:BUG_ACE-632)
      • Bug fixed: When performing a global search, the located keywords are not highlighted as they should be. (Ref.:BUG_ACE-633)

AceProject 6.0 is officially released! – 2012-11-26
      • Enhancement: Portfolio tab eliminated. Contents accessible through the Portfolio and My Office tabs are now merged in the new Home tab.
      • Enhancement: Pulldown menus added when clicking the right edge of the Home and Project tabs for quicker access to frequently viewed pages or common actions.
      • Enhancement: Incomplete and completed task lists and report pages merged in single pages of the interface. These multiple lists and reports are now accessible through a “Views” drop-down instead.
      • Enhancement: Avatars added.
      • Enhancement: New “+” button in the top frame facilitates creating or locating and opening an existing project. This button also allows you to open multiple projects simultaneously.
      • Enhancement: Breadcrumbs added in top portion of the main frame for clearer identification of page currently displayed and to facilitate navigation.
      • Enhancement: Right pane added in project, task, time and expense list pages and reports for filtering and applying actions on checked items.
      • Enhancement: Right pane no longer scrolls along with the main page. This avoids having to scroll back up to reach action buttons located in the right pane.
      • Enhancement: Column headers and page navigation sections in project and task lists are now frozen. They no longer scroll along with the main page.
      • Enhancement: Full-screen button added in the lower right-hand corner of the screen. In full-screen mode, the top and left frames are removed from view in order to maximize space for main page contents.
      • Enhancement: Clicking on corporate logo now returns you to your default Home tab page.
      • Enhancement: Improved printer version printouts.
      • Enhancement: New skin colors.
      • Enhancement: New HTML component replaces the one previously used for task Details and Comments fields as well as for Discussion Forum replies and Mailbox messages.This eliminates the need for double pasting.
      • Enhancement: “Keep me logged in” checkbox added on the login page. This allows you to remain logged for a certain amount of time or until you log out. As long as your session remains active, authentication will be bypassed if you call your account Web address. (Ref.:DEV_ACE-20)
      • Enhancement: Date variables may now be used in the Task Summary field of recurring tasks. This allows you to have tasks generated by a recurrence with unique Summary field values to help you tell the different instances of a given recurrence apart. (Ref.:REC_ACE-147)
      • Enhancement: Multi-select added in the time report filters. (Ref.:BUG_ACE-430)
      • Enhancement: Multi-select added in the expense report filters. (Ref.:BUG_ACE-431)
      • Enhancement: Project tabs can be reordered in the top frame by drag-and-drop.
      • Enhancement: Multi-user project level assignment update added.
      • Enhancement: Multiple supporting documents may now be attached to expenses.
      • Enhancement: Project assignment e-mail notification preference added.
      • Enhancement: Project documents can now be moved from one folder to another.
      • Enhancement: Many new filtering options added in task and project list pages.
      • Enhancement: “Changes detected” warning added on project and task document upload pages.
      • Enhancement: Drag-and-drop now supported on project document upload pages.
      • Enhancement: iPad now fully supported (screen resizes automatically).
      • Enhancement: Chart added in dashboard.

2012-11-21
      • Bug fixed: In a “Search within project” results list, when you click on a column header to sort the list, tasks from other projects appear. (Ref.:BUG_ACE_50-1113)
      • Bug fixed: When “Remember Password” is checked, the username field value is not always populated on subsequent logins. (Ref.:BUG_ACE_50-1125)
      • Bug fixed: In the Task Recurrences page, the button to navigate to the last page of the list does not work. (Ref.:BUG_ACE_50-1169)
      • Bug fixed: Task list export not working when list includes recurring tasks. (Ref.:BUG_ACE_50-1172)
      • Bug fixed: AceProject crashes when a user with D1 Edit Task Level attempts to delete a task. (Ref.:BUG_ACE_50-1176)
      • Bug fixed: Issue with creation of a recurring task if one user is assigned to the task and an e-mail must be sent. (Ref.:BUG_ACE_50-1177)

2012-10-26
      • Enhancement: Project assignment e-mail notifications will more clearly convey the modifications that have been performed. (Ref.:DEV_ACE-151)
      • Bug fixed: Inactive user can lookup account login page URL from https://login.aceproject.com/ (Ref.:BUG_ACE-943)
      • Bug fixed: Project assignment sent to users not assigned to the project. (Ref.:BUG_ACE-1120)
      • Bug fixed: Task Reminder e-mails still being sent on disabled accounts. (Ref.:BUG_ACE-1148)
      • Bug fixed: Custom Task Reports no longer showing. (Ref.:BUG_ACE-1166)
      • Bug fixed: Error when trying to create an expense. (Ref.:BUG_ACE-1168)
      • Bug fixed: Pagination issue in the Edit Task page of the mobile version. (Ref.:BUG_MOB-242)

2012-10-19
      • Bug fixed: Unable to add an expense. (Ref.:BUG_ACE-1162)

2012-10-05
      • Bug fixed: Non-assigned projects showing up in User Workload Report by Project for normal users. Additionally, User Workload Report now shows other users’ time allocation only on projects that the connected user has Project Manager rights over. Other users’ time allocation on projects that the connected user is assigned to but does not have Project Manager rights on, will be grouped together in a single “Other Projects” line. (Ref.:BUG_ACE-842)
      • Bug fixed: User level “Last Visit” date not updating itself properly. (Ref.:BUG_ACE-1155)

2012-09-20
      • Enhancement: E-mail notification ReplyTo addresses are now encrypted. (Ref.:BUG_ACE-1100)
      • Bug fixed: When opening a task from a custom task report results screen and clicking on “Printer Version”, AceProject prints out the custom report results instead of the opened task. (Ref.:BUG_ACE-1088)
      • Bug fixed: Budget Hours column in Portfolio: All Projects page showing zeros for certain projects when in fact non-zero values have been provided. (Ref.:BUG_ACE-1142)

2012-09-18
      • Enhancement: Now possible to Move/Copy a task created from a recurrence. If the task is moved, it will be dissociated from the recurrence that generated it. If a new task is created as a result of copying the original, the new task will not be associated to a recurrence and the original task will remain associated to its recurrence. (Ref.:REC_ACE-32)
      • Bug fixed: On task document uploads, the Updated By and Updated On fields are not updated. (Ref.:BUG_ACE-1099)
      • Bug fixed: Project level “Users View” time approval request not working.(Ref.:BUG_ACE-1127)
      • Bug fixed: Date of last day in user workload time range not calculated properly. (Ref.:BUG_ACE-1134)

2012-09-13
      • Bug fixed: “Auto create weeks” option not checked by default when a new user is created. (Ref.:BUG_ACE-1111)

2012-09-11
      • Bug fixed: When you navigate to the My Tasks page, it does not filter out completed tasks as it should. One needs to click on “Apply Filter” for completed tasks to be filtered out. (Ref.:BUG_ACE-1119)

2012-09-07
      • Bug fixed: Certain field values missing in the Custom Task Report “Printer Version”. (Ref.:BUG_ACE-1083)
      • Bug fixed: Printer version of custom task report does not show values for certain fields in the “Identification” section. (Ref.:BUG_ACE-1083)
      • Bug fixed: Branding changes not immediately being applied (caching issue). (Ref.:BUG_ACE-1091)
      • Typo: Monthly recurrence pattern weekdays drop-down shows days of the week without the 1st letter capitalized and “thuesday” instead of “Thursday”. (Ref.:BUG_ACE-1117)

2012-08-28
      • Bug fixed: AceProject does not handle cleanly a situation where someone is about to assign a user but, in the meantime, someone else deletes that user. (Ref.:BUG_ACE-1044)

2012-08-22
      • Enhancement: Code changes to speed up the loading of task lists. (Ref.:DEV_ACE-144)
      • Enhancement: “Expense Document” document type added for easier identification of expense supporting documents. (Ref.:DEV_ACE-704)
      • Bug fixed: Lag time was being applied to Actual End Date field value instead of being applied to date and time the predecessor task was actually closed. Lag time now displayed in hours. (Ref.:BUG_ACE-965)
      • Bug fixed: Issue with copying a project which includes Custom Hours assigned to users who are not assigned to the new project. (Ref.:BUG_ACE-1077)
      • Bug fixed: When copying a task with assigned Custom Hours to a project where the users assigned on the original task are not assigned, copying the task works but the new task cannot subsequently be opened. (Ref.:BUG_ACE-1102)
      • Bug fixed: Dashboard was not indicating the number of incomplete marked projects the user has but the total number of marked projects. (Ref.:BUG_ACE-1108)
      • Bug fixed: “Notify me every time I create or update a task” was not being sent if the user was neither creator, assigned or reviewer on the updated task. (Ref.:BUG_ACE-1109)
      • Bug fixed: Editing a task following a global search was very slow or simply timing out. (Ref.:BUG_ACE-1110)
      • Bug fixed: Issue with custom task reports with 0 matching tasks. (Ref.:BUG_ACE-1115)

2012-08-01
      • Bug fixed: Note relative to fields marked by stars (“*”) in the Edit Custom Task Report is inaccurate. This note suggests the fields that have stars are mandatory but they are not.
        (Ref.:BUG_ACE-1051)
      • Bug fixed: When a user used to try accessing a no longer existing task through the Summary link of an email notification, AceProject did not handle the error cleanly. From now on, a “This task cannot be accessed. You might not have the necessary rights to open the task or it might have been deleted.” message will appear in this situation. (Ref.:BUG_ACE-1094)
      • Bug fixed: Issue with the date filters under Portfolio > Tasks > Task Reports > By Date when filtering by Estimated End Date. (Ref.:BUG_ACE-1101)

2012-07-16
      • Password change now immediately terminates all ongoing sessions associated with the user except the one the password change was performed on. (Ref.:BUG_ACE-970)
      • Bug fixed: When replying to a task update/assignment email notification, if the email is in plain text, it is not handled appropriately. (Ref.:BUG_ACE-1015)
      • Bug fixed: Issue with Dashboard “Add a project” button in IE7. (Ref.:BUG_ACE-1050)
      • Task Reminder process optimization. (Ref.:BUG_ACE-1061)
      • Terminology adjustments to the project assignment/unassignment email notification. (Ref.:BUG_ACE-1068)
      • Bug fixed: Javascript error in file top.asp when using IE8 or IE9. (Ref.:BUG_ACE-1071)
      • Bug fixed: Dependency lag time preventing project from being closed. (Ref.:BUG_ACE-1073)
      • Terminology adjustment: “Show un-assigned users” link changed to “Show non-assigned users”. (Ref.:BUG_ACE-1074)
      • Bug fixed: issues with the global search when using a number followed by a hyphen (ex. “487-“) and when text contains an apostrophe. (Ref.:BUG_ACE-1076)
      • Bug fixed: Dashboard “Soon Due” Task List not showing “In Progress” status tasks. (Ref.:BUG_ACE-1082)
      • Bug fixed: “Ready to Start” field does not accurately take into account dependency lag times. (Ref.:BUG_ACE-1084)
      • Bug fixed: issues with the “Send reminders now” function of the Task Reminder. (Ref.:BUG_ACE-1086)
      • Bug fixed: Issue with navigation between pages in task lists with IE7 and IE8. (Ref.:BUG_ACE-1092)

2012-06-26
      • Bug fixed: Dashboard “Soon Due” Task List not showing “In Progress” status tasks. (Ref.:BUG_ACE-1082)

2012-06-21
      • Bug fixed: “Add a task to this project…” button displayed although user does not have sufficient rights on any assigned project to add tasks. (Ref.:BUG_ACE-958)
      • Bug fixed: Dependency Lag Time value specified (in hours) cannot be supported. AceProject actually rounds down the lag time value to an integer number of days. AceProject now prompts for a lag time in days. Data entered in client databases has been adjusted accordingly. (Ref.:BUG_ACE-965)
      • Upon replying to an AceProject task update/assignment notification, an email notification will automatically be sent to the user replying to the notif (regardless of whether “Notify me every time I create or update a task” is checked or not) as a confirmation of his/her task update. (Ref.:BUG_ACE-1016)
      • Bug fixed: Portfolio – All Projects/Assigned Projects not sorting projects correctly when Priority is the first sorting order field. (Ref.:BUG_ACE-1023)
      • Bug fixed: After error upon attempt to save a new task, the associated project information, in the Edit Task Information page, is lost. (Ref.:BUG_ACE-1043)
      • Bug fixed: Returning to a task through the Summary link of an email notification yields a permission issue message. (Ref.:BUG_ACE-1045)
      • Improvement: More descriptive error messages for the Multiple Task Assignment function. (Ref.:BUG_ACE-1047)
      • Bug fixed: Issue with Dashboard “Add a project” button in IE 7. (Ref.:BUG_ACE-1050)
      • Bug fixed: “Show un-assigned users” link appears under the task assignment grid even though the connected user does not have the necessary rights to assign users to the associated project. (Ref.:BUG_ACE-1052)
      • Bug fixed: Recurrence “Related Tasks” list page not displaying tasks associated with the proper recurrence. (Ref.:BUG_ACE-1054)
      • Bug fixed: Edit Project Information not displaying properly in Firefox after changing the status of the project. (Ref.:BUG_ACE-1055)
      • Bug fixed: AceProject not dissociating a task from its recurrence when a document is attached to it. (Ref.:BUG_ACE-1059)
      • Bug fixed: Recurrence not accurately determining Estimated End Date of certain tasks when “Weekends Allowed” is selected. (Ref.:BUG_ACE-1060)
      • Bug fixed: Help buttons for “Task Recurrences” and “Edit Recurrence Information” pages linked to corresponding help page. (Ref.:BUG_ACE-1062)
      • Bug fixed: Javascript error on “Edit Recurrence Information” page when selecting “Custom Hours” mode. (Ref.:BUG_ACE-1064)
      • Bug fixed: “Add Time” and “Add a task to this project” dropdowns not working when using IE 7 and IE 8. (Ref.:BUG_ACE-1065)
      • Terminology adjustments to the project assignment/unassignment email notification. (Ref.:BUG_ACE-1068)
      • Bug fixed: “Start/Stop Time Clock” and Task Group pages linked to Knowledge Base Category pages. (Ref.:BUG_ACE-1070)
      • “—– Write above this line to post a reply —–” added in task assignment/update email notifications. (Ref.:DEV_ACE-132)
      • Bug fixed: Issue with recurring tasks set to begin on the 30th or 31st of a month. (Ref.:REC_ACE-162)
      • Bug fixed: Getting an “Access Denied – You don’t have enough access rights…” message when trying to create a recurrence through a task under My Office. (Ref.:REC_ACE-163)

2012-06-16
      • New FAQ-based searchable help system unveiled. (Ref.:DEV_ACE-133)

2012-06-15
      • Bug fixed: Task Reminder and “Account limitations reached” daily emails sent twice or not at all. (Ref.:BUG_ACE-1033)

2012-06-12
      • Bug fixed: “Back” hyperlink on Edit Task Information page not working in certain circumstances. (Ref.:BUG_ACE-960)
      • Bug fixed: “Do not notify” checkbox visible on Task Document page for users with C2 Edit Task Level or less. (Ref.:BUG_ACE-963)
      • Bug fixed: Portfolio – By Date task report export issue due to outdated field names. (Ref.:BUG_ACE-971)
      • Bug fixed: Issue with the paste popup on task Comments field with Firefox. (Ref.:BUG_ACE-978)
      • Bug fixed: Text for custom task report deletion warning is in English when user is viewing French interface. (Ref.:BUG_ACE-982)
      • Bug fixed: Project export count indicates the correct count but only marked projects are exported. (Ref.:BUG_ACE-990)
      • Maximum number of tasks for a task import set to 2000. (Ref.:BUG_ACE-996)
      • Bug fixed: When navigating from one page of tasks to another in the “Assigned” tasks (accessible through Dashboard), AceProject does not retain the “Assigned Only” filter setting. (Ref.:BUG_ACE-999)
      • Bug fixed: Error upon attempt to save/update a task when Estimated Hours format contains both a comma “,” and period “a”. (Ref.:BUG_ACE-1002)
      • Bug fixed: Task notification e-mail to self says “Task modified” when the task has just been created. (Ref.:BUG_ACE-1021)
      • Bug fixed: Incomplete tasks remain after setting the project to completed. (Ref.:BUG_ACE-1025)
      • Bug fixed: Calendar “All fields” export crashes. (Ref.:BUG_ACE-1032)
      • Bug fixed: “See selected task” task dependency icon bug. (Ref.:BUG_ACE-1037)
      • Bug fixed: Issue when trying to generate a custom task report by clicking on its name link when the custom task report has just been deleted by another user. (Ref.:BUG_ACE-1038)
      • Bug fixed: Issue on the “Edit Task Information” page when in Custom Hours mode. (Ref.:BUG_ACE-1040)
      • Bug fixed: Issue on the “Edit Recurrence” page when in Custom Hours mode. (Ref.:BUG_ACE-1041)
      • Email notification added for bulk project assignment/un-assignment. (Ref.:DEV_ACE-118)
      • “Assigned” and “Reviewer” columns added in the Task Reminder email. (Ref.:DEV_ACE-134)
      • Bug fixed: “Update” button available when recurrence reactivation pop-up window is displayed. (Ref.:REC_ACE-159)
      • Modifications to the “Task Limit Reached” e-mail notification. (Ref.:REC_ACE-161)
      • Task assignment and update notifications now all have “Created/Modified” in the Subject of the email. (Ref.:DEV_ACE-121)

2012-06-07
      • Bug fixed: E-mail notification sent to a user each time a task is created from a recurrence although the “If I’m assigne or reviewer: When a task is created” checkbox is not checked.(Ref.:REC_ACE-150)
      • Bug fixed: Issue with saving recurrence in Custom Hours mode. (Ref.:BUG_ACE-1029)
      • Bug fixed: Issue with not being able to reactivate a recurrence.(Ref.:REC_ACE-158)
      • Bug fixed: Error when adding user to project after clicking on “Manage Access Rights” in Edit Task Information page. (Ref.:BUG_ACE-1019)
      • Bug fixed: Issue saving a recurrence when project set to “Including Weekends”. (Ref.:BUG_ACE-1024 and BUG_ACE-1030)
      • Bug fixed: ReplyTo function does not handle mails sent from Outlook 2011 for MAC and MAC Mail 2011 correctly. (Ref.:BUG_ACE-1014)

2012-06-05
      • “Remember” checkboxes added in all Portfolio -> Projects and My Office -> Projects pages. (Enhancement Ref.: Bugs AceProject #1031).

2012-06-01
      • When a user is assigned to a project via the “Edit Task” page, the C2 Edit Task Level access right is granted. (Bug fixed Ref.: Bug AceProject #1018).
      • Portfolio By Date task report “is [date]” and “is later than or on [date]” date filters not working properly. (Bug fixed Ref.: Bug AceProject #987).
      • Expense Approval rights now granted by default when assigning users to projects. (Bug fixed Ref.: Bug AceProject #1020).
      • “First” et “Last” Calendar and Gantt chart buttons changed to the “Twin Arrows” buttons. (Ref.:BUG_ACE-879)

2012-05-30
      • Gantt -Weekly view displaying as Monthly view, when filtering on “Assigned” field.(Bug fixed Ref.: Bug AceProject #940).

2012-05-29
      • Code optimizations in the “Assignment” section of the Edit Task Information page in order to improve performance.(Bug fixed Ref.: Bug AceProject #1010 and #1013).
      • Bug fixed: Under certain circumstances, users were being unassigned from tasks. (Ref.:BUG_ACE-1009)

2012-05-24
      • Recurring tasks now  online.

2012-05-17
      • Project Number field now automatically populated by AceProject. (Enhancement Ref.: Development #721 Aceproject).
      • Default Edit Task Level set to D2. (Enhancement Ref.: Development #122 Aceproject).
      • Ability to un-assign users from a project in bulk added. (Enhancement Ref.: Development #124 Aceproject).
      • “Show Un-Assigned Users” link added at bottom of task assignment grid. You may now use that link to assign users to the task and to the associated project in the process. (Enhancement Ref.: Development #128 Aceproject).
      • When setting the project to a “Completed” status, AceProject prompts you to close outstanding items (tasks, unapproved work items, unapproved expenses) in bulk.  (Enhancement Ref.: Development #56 Aceproject).
      • Replying to an e-mail notification now automatically adds a comment on the corresponding task.
      • Option added to have e-mail notifications sent for own task creations/updates. (Enhancement Ref.: Development #93 Aceproject).
      • E-mail notification now sent to task creator, assigned users and reviewers upon task deletion. (Enhancement Ref.: Development #726 Aceproject).

2012-05-07
      • “Ready to Start” task level field and Dashboard item added. This field may be displayed in My Tasks and Incomplete Tasks (Enhancement Ref.: Development #545 Aceproject).
      • “You are not authorized to comment on this project” error message when returning to task through an e-mail notification (Bug fixed Ref.: Bug AceProject #951 Aceproject).

2012-05-03
      • AceProject opens a task in project A after project level assignments in project B (Bug fixed Ref.: Bug AceProject #956 Aceproject).
      • Manual (Timesheet mode) time entry added in the mobile version (Development Mobile version).

2012-04-26
      • “To Start Soon” item added in the task reminder (Enhancement Ref.: Development #760 Aceproject).
      • When adding a comment upon task creation, the comment will be placed at the top of the e-mail notification (Enhancement Ref.: Development #754 Aceproject).
      • “Always notify me when I create or update a task” checkbox added in the user profile and My Office -> Preferences e-mail notification sections (Enhancement Ref.: Development #117 Aceproject).
      • “Project” and “Task” columns added to the time approval request and approval confirmation e-mail notifications (Enhancement Ref.: Bug AceProject #977 Aceproject).
      • Gantt chart  weekly view displaying as monthly view when applying filters (Bug fixed Ref.: Bug Aceproject #940 Aceproject).

2012-04-20
      • Task update e-mail notification sent to creator and assigned users when a task is deleted (Enhancement Ref.: Development #726 Aceproject).
      • Issue with downloading documents in Android and iOS app’s (Ref.:BUG_MOB-224)

2012-04-03
      • Edit Task – Assignment area, displaying link to add user to the associated project on multiple lines (Bug fixed Ref.: Bug Aceproject #959 Aceproject)
      • Bug in process associated with auto-deletion of projects marked as deleted. (Bug fixed Ref.: Bug Aceproject #950 and 964 API)

2012-03-28
      • Timeouts occurring when updating tasks with many dependencies. SQL execution timeout was increased to 90 seconds.

2012-03-27
      • Task notification not sent when overwriting document with the same version number. (Bug fixed Ref.: API)

2012-03-24
      • After 2012-03-23 release, some custom reports stopped working because recurrency fields were not properly defined. (Bug fixed Ref.: API)

2012-03-23
      • Overdue Tasks page columns out of sync for normal users. (Bug fixed Ref.: Bug Aceproject #948 Aceproject)
      • Printer version display issue. (Bug fixed Ref.: Bug Aceproject #941 Aceproject)
      • Gantt -Weekly view displaying as Monthly view, when filtering on “Assigned”. (Bug fixed Ref.: Bug Aceproject #940 Aceproject)
      • Project list cannot display more than 10 projects per page. (Bug fixed Ref.: Bug Aceproject #939 Aceproject)
      • Unable to reach the Save button in weekly calendar export popup. (Bug fixed Ref.: Bug Aceproject #934 Aceproject)
      • Projects marked as deleted appearing in list of assigned projects. (Bug fixed Ref.: Bug Aceproject #933 Aceproject)
      • Link to open task document added at the bottom of task assignment/update email notifications. (Enhancement Ref.: Bug Aceproject #930 Aceproject)
      • “Active” and “Inactive” appearing in the “Template” column in Portfolio project list page. (Bug fixed Ref.: Bug Aceproject #928 Aceproject)
      • Remain on the Timeclock page after starting the timer. (Enhancement requested Ref.: Bug Aceproject #887 Aceproject)
      • “Regular Version” link added on mobile login page. (Enhancement Ref.: Bug Mobile #192)
      • Hide the “Add task” button if user does not have necessary rights. (Bug fixed Ref.: Bug Mobile #212)
      • Project search functionality completed. (Enhancement Ref.: Bug Mobile #209)

2012-03-21
      • Fix on Android app for special characters in account info.

2012-03-15
      • Mobile (Android, iOS) – You can now open supported documents and external links inside the application and get back to it.

2012-03-01
      • Mobile – Task List – You now see information about the last change (when / who) on 3 lines.
      • Task List – The “height” of an item is now fixed to a maximum size, so you can add the “comments” and “details” field and still see your list correctly.

2012-02-27
      • Project Search added in the Projects section of the left menu and in the contextual menu when viewing a project list. (Development Mobile version)
      • Last update info on task displayed in all task lists – Example: Modified two hours ago by Jenny (Development Mobile version)
2012-02-21
      • When copying an existing week, all work items associated with completed or deleted projects will not be copied. (Development Ref.: Bug Aceproject #932 Aceproject)
      • Aide-EditTask.asp contextual help page not appearing. 404 error. (Bug fixed Ref.: Bug Aceproject #937 Aceproject-API)
      • Edit Task page comment thread not sorting properly by User and Date. (Bug fixed Ref.: Bug Aceproject #917 Aceproject-API)

2012-02-20
      • Apple App Store Release

2012-02-16
      • Android App Update – add ability to open task from email notification in native android app

2012-02-01
      • Mobile Update – New Menu, global search, …
      • When copying an existing week, all work items associated with completed or deleted projects will not be copied. (Development Ref.: Development #79 API)
      • Issue with the “Default Pages-> My Office” preference when importing users . (Bug fixed Ref.: Bug Aceproject #870 Aceproject-API)
      • Improving error handling on erroneous Intranet package SMTP server configurations. (Development Ref.: Bug Aceproject #875 API)
      • Allowing a user with D1 or D2 Edit Task Level to add comments on the task even if the user isn’t task creator or assigned to the task. (Development Ref.: Bug Aceproject #878 Aceproject-API)
      • User passwords are reset on user import when the password column contains “******”. (Bug fixed Ref.: Bug Aceproject #881 API)
      • Log SQL query executed when an error occurs (Internal Ref.: Bug Aceproject #897 API)
      • Bad Work Items count on Time->Time Approval->Weekly View (Bug fixed Ref.: Bug Aceproject #900 SQL)
      • The link between a child project and its parent must immediately be removed without having to save/update the page. (Bug fixed Ref.: Bug Aceproject #903 Aceproject)
      • In Edit Expense and Time Approval, remove the “…” at the end of each task summary in the drop-downs.(Development Ref.: Bug Aceproject #904 Aceproject)
      • Add Time icon not showing up in Edit Task for a non-assigned, C2 level user. (Bug fixed Ref.: Bug Aceproject #905 Aceproject)
      • Excel export issue when expenses have negative values (Bug fixed Ref.: Bug Aceproject #906 Aceproject-API)
      • Account status was showing negative values. (Bug fixedRef.: Bug Aceproject #907 Aceproject-API)
      • Can’t delete Task Group even though there are no tasks associated with that Task Group. (Bug fixed Ref.: Bug Aceproject #908 SQL)
      • When creating a week from an existing week, time associated with completed tasks is being copied. (Bug fixed Ref.: Bug Aceproject #914 API)

2012-01-25
      • bug fix when downloading a non-existing file

2012-01-18
      • add “paging” on task document list

2012-01-17
      • some performance issue in API

2012-01-13
      • timeout getting “week” in timesheet management

December 2011
      • 21. Android Market Release
      • 20. Bug fix when highlighting search results
      • 16. Bug fix on user workload when copying task
      • 07. Performance increased when performing certain type of searches

November 2011
      • 30. It’s now easier to switch from “desktop” to “mobile” version
      • 29. Drag and Drop Upload
      • 29. Small update when saving task using “iPad”
      • 29. Time Clock – “recent projects” and “recent tasks”
      • 22. Update for international characters in username